ST0501-CS120905Deforest Road from MacArthur Blvd. to Allen Rd. – traffic has been moved
to the new concrete pavement (south half of road) and work has begun on
the north half. Activities include intersection and driveway
demolition/excavation in preparation for the new concrete to be poured.
Traffic movement is still one-way west to east between MacArthur and
Allen and barricades are in place to assist with traffic flow. Contact
Larry Davis or George Marshall if you have any questions.
Please forward this message to those in your work group who may need
this information.
Rhonda Adloo
Engineering Dept.
972-304-3682
radloo@coppelltx.gov