Loading...
Carter Addn 3-CS120910 T H E C I T Y O F COPPELL T o q A S - , September 10, 2012 John E Papagolos Papagolos Development Company 5225 Village Creek Drive, Suite 300 Plano, TX 75093 RE: Carter Addition, Phase III Dear Mr. Papagalos: A pre-construction conference on the referenced project has been scheduled for Wednesday, September 12, 2012 at 10:00 a.m. in the first floor conference room in Town Center at 255 Parkway Blvd. Please notify representatives from the franchise utilities, your chosen testing lab, your sub-contractors and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3685. Sincerely, Albert Samaniego Construction Inspector Office Phone: 972-304-3685 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative