September 10, 2012
John E Papagolos
Papagolos Development Company
5225 Village Creek Drive, Suite 300
Plano, TX 75093
RE: Carter Addition, Phase III
Dear Mr. Papagalos:
A pre-construction conference on the referenced project has been scheduled for
Wednesday, September 12, 2012 at 10:00 a.m. in the first floor conference room in Town
Center at 255 Parkway Blvd.
Please notify representatives from the franchise utilities, your chosen testing lab, your
sub-contractors and any other interested parties so that they may have a representative
present. If you have any questions concerning this project prior to the scheduled meeting,
feel free to contact me at (972) 304-3685.
Sincerely,
Albert Samaniego
Construction Inspector
Office Phone: 972-304-3685
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative