Loading...
WA0602-CS120917 (2) T H E • C I T Y O F COPPELL . c, A 5 1 September 17, 2012 RE: Project#WA 06-02, South Moore Rd. Drainage Improvement • Dear Resident or Business Owner: The Engineering Department has contracted with Canary Construction of Coppell to improve drainage in the Stringfellow Addition, south of Sandy Lake and west of Moore Rd. We will work to improve problems in this area that have occurred due to redevelopment in the past few years. One of the items to be solved is the elimination of an old 2" water service that only serves one home, the other problem concerns poor drainage in this general area. To solve the drainage problem the contractor will extend an 18" drainage pipe an additional 272 feet in order to connect it to a 30" storm drain, and install two inlets to drain the water efficiently into the pipe. The contractor will begin work on or about September 19`1' and should be complete with the project in approximately 30 days, depending on the weather. You should expect to see workers, vehicles and equipment from Canary Construction in your neighborhood performing these activities soon. The inspector for the project will be Rick O'Dell, who can be contacted at 469-576-7709. If you have any project-related questions, feel free to contact me at the number below. Sincerely, Keith Marvin, P.E. Project Engineer Office: 972-304-3681 Fax: 972-304-3570 kmarvinna,coppel ltx.gov cc: Rick O'Dell, Construction Inspector Wayne Borstad, Canary Construction 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673