Loading...
Freeport Xing-CS120918 T H E C I T Y O F COPPELL A S` , September 18, 2012 Jaime R. Beard, P.E. Jones & Carter, Inc. 6509 Windcrest, Suite 600 Plano, TX 75024 RE: Minyard Addition,Lot 4R Block 1 Construction Plan Review Comments (1st submittal) The City of Coppell has reviewed the referenced plans and these plans will be approved with the following comments addressed: General 1. Include Plat with drawing set. 2. Add"Minyard Addition, Lot 4R Block 1"to the cover page. The City of Coppell has reviewed the revised plans for the referenced addition and they have been approved. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions,please contact me at your convenience. Sincerely, iii;//)/ /466L/ Michael Ga , P.E Civil Engineer Office: (972)304-7019 mgarzancoppel ltx.gov 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673