Loading...
WA9401-CS 950522 (2)APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 (Instruclions on reverse side) ,'AGE ONFOI~ P^Gt:S TO C~ty of Coppell I'ROIECT: ~ast Boltline Road APPLICA[ION NO: 4 & FIN~ Distribution to: P. O. Box 478 Water Line Project [3 OWNER Coppell, TX 75019 (T~A 94-01 ) PERIOD TO: 5/18/95 [:]ARCHITECT [] CONTRACTOR FROM (CONTRACTOR): ~CHI'I']L"Td]~ U~ILITIES, INC. ARCHITEC['S P. O. Box 11586 I'I(OIEC[ NO: [] Forl= Worth, ~X 76110 AUI Job # 94061 CONTRACT FOR: CONTRACT [)ATE: CONTRACTOR'S APPLICATION FOR PAYMENT CHANGE ORDER SUMMARY Change Orders approved in previous rnonlhs by Owner TO1AL Approved this Monlh Number Dale Approvecl ADDI'I IONS I)LI)UC'I IONS TO'IAL5 Nel chanBe by Change Orders The undersiEned Conlraclor certi(ics Ihal Io the besl o1' Ihc Ccmlrac h~r's knowledge, iniormalion and belie[ Ihe Work cavered by Ihis Applicalicm for I'aymenl has heen compleled in accordance wilh Ihe Conlracl Dix:u~nenls, Ihal all :.nounis have been paid by the Conlraclor (or Work for whicl~ i~revious CerliJicales Lot I~aynR,nl were issued ancl paynlcnls receiv¢:d from Ihe Owner, aud Ihal ct, trenl ixWmenl shown herein is now due. CONTRACTOR: Dj, le: 5/22/95 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance wilh the Conlracl Documents, based on on-site c~bservaliuns alld the dala comprising Ihe above applicalion, Ihe Archilecl cerlifies Io Ihe Owner Ihal Io Ihe besl ol Ihe Arcbilecl's knowledge, inforn~alion and belie[ the Work has progressed as indicated, Ihe qualily o[ Ihe Work is in accordance wilh Ihe Conlracl Documenls, and ~e Conlractor is enlilled Io paymeal o[ Ihe AMOUNI' CER'I IFIED. Ai}l~lic:alion is made for Paymenl, as shnwn below, in conneclion wilh Ihe Conlracl. Continualion Sl~eel, AIA Dgcumenl G703, is allached. 1. ORIGINAL CONTRACT SUM ....................... $ 133,976.54 2. Nel change by Change Orders ..................... $ 3. CONTRACT SUM TO DATE (I.ine I ~: 2) .............. $ 133,976.54 4. TOTAL COMPLETED & STORED TO DATE ............ $ 130,462.75 (Column G on G703) 5. RETAINAGE: a. % of Completed Work $ 0.00 (Column D + E on G703) b. __ % o[ Stored Material $ (Colunto F on G703) Total R~:lainage (I. ine 5a + 5b or lolal in Ccfiumn I of G703) ..................... $ 0.00 6. TOTAL EARNED LESS RETAINAGE ................... $ 130,462.75 (I.ine 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Cerlificale) ......... $ 116,721.49 8. CURRENT PAYMENT DUE .......................... $ 13r741.26 9. BALANCE TO FINISH, PLUS RETAINAGE ............. $ 0.00 (I.ine 3 less Line 6) 51ale o(: ~ · _~ .:.,~'...~ Counly ol: TARRA~,. ! ARCI4 ITFCT: IJy: Dale: This Cerlific:ale is nol negoliahh;. The AMOUNT CERTIFIED is payable only Io Ihe Conlraclor named herein. Issuance, payment and acceplance o[ paymenl are wilhoul prejudice Io any rights of the Owner or Conlraclor under Ihis Conlracl. AIA DOCUMENI G702 · Al'lq ICAI II)N AND CIRI lI ICA'IF FOR I'AY~,II:NI' · MAY I¢111.1 IIII II(.)N · AIA' · ~;. THE. AMLRICAN INS1HUII. C)l' ARCHIII.CIS, 1715 NEW YCIRK AV[NUI. N.W., WASIIIN(H(.IN. I).C. 21Rlllh G702-1983 CITY OF COPPELL P. O. BOX 478 COPP~LL, TX 75019 PI%CXTECT: FaaT BELTLINE ROAD WATER MAIN ORIGINAL CONTRACT COST: $133,976.54 PERIODICAL ESTIMATE NO. 4 & FINAL CONTRACTOR ARCHIT~CTUP~L UTILITIES, INC. P. O. BOX 11586 FOI~ WOETH, ~X 76110 PERIOD 3/01/95 TO 5/18/95 AUI JOB NO. 94061 Quantity Quantity Quantity Quantity value of value of original complete completa Complete Work Complete Work Completa Item Description Estimate UM Unit Price Prev.Mo. This Month To Date TLls Month To Date 8w DR-14WATER = 2507 z LF: $24.17 s 2507 = 0: 2507: $0.00: $60,594.19 12" CL 150 WATER : 1178: LF: $28.55: 1178: 0: 1178: $0.00: $33,631.90 8" GATE VALVE : 7: EA= $448.00: 7: 0: 7: $0.00: $3,136.00 REODNNECT 2" SERVICE: I: EAT $451.00: 0: I: I: $451.00: $451.00 BO~ FOR 8" PIPE : 236 ~ LFS $121.67: 262: -23.76: 238.24: ($2,890.88)~ $28,986.66 AIR F~T.nASE VALVE : 2: BA: $832.00: I: 0; I I $0.00: $832.00 2" BLOW OFF : I: EA: $1,118.00: I: Q: I: $0.00: $1,118.00 4' FIl~8 BYDRAIqT : 1 = EA: $1,416.00 ~ I ~ 0: 1: $0.00: $1,416.00 2e TEMP. WA"ZgP, ; 500; LF: $6.60: 45: 0 = 45 I $0.00: $297.00 ($2,439.88) $130,462.75 PERFORMED O!( ORIGINAL CORTR~'E EXTRA WORK P~RFORMED TOTAL VALUE OF WORK TO DATE LE~8 RETAINAGE - 10% ITETAMOUNTFa~RNEDOBCO~TRACT LESS AMT OF PREVIOUS PAYMENTS $130,462.75 $o.oo $130,462.75 $o.oo $130,462.75 $116,~21.49 AMOUNT DUE' TBIS ESTIMATE $13,741.26