Loading...
ST0501-LR120919 (2) SEP-21-2012 04:48 P.01/01 C AVA Texas CMT, Inca Date Construction Materials Testing Post-if Fax Note 7671 pag°es► and Environmental Consulting r R From •-rexAS ed M"'r'A Ca./De t I so' A- 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352- p.1∎15PCel-OR ./.Q phone#9 2.3 04- 34 m -hone#.. ("f 352. A 3 0 4 5-7 6 r• s7 ' GENERAL REPORT ❑ CA_ .. �.�.ury i�vi� STAND-BY Report Date: September 19,2012 Test Date: Sen ember 18,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 8 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of l Results Scheduled Concrete Arrival Time 2:00 PM Type of Service Scheduled: Concrete Cylinders Scheduled for Texas Inlets at Prestwick& Deforest, Sta. 1+73 &4+09. Time Concrete Arrived at Job: 3:08 PM Total Charged Time: . . . 1.0 Hour Reason- te 1'. . . On arrival..at job site, concrete was said to be running-1/4 hour late.TXI concrete delivery arrived ' one(1)hour and eight(8)minutes late. / ) Technician: RG I cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill @TiseoPaving.com Mr. Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail:Bobby @CalConTex.com Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: - MI letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.01