Loading...
Tax 2012C-CS120918 September 18, 2012 Sales Tax 2012 Residential Street Improvements RE: Southern Belle from River Rd. to Plantation Drive. Dear Resident: The citizens of Coppell approved in November 2007, and reauthorized again in November 2011, the use of 1/4¢ cent of the sales tax for maintenance of residential streets. At the th September 11 City Council meeting, a contract with Verdunity, Inc. was approved for the design of a project to reconstruct the above referenced street. Representatives working with the consultant will be in your area within the next week or so to begin the preparatory work necessary for the design of the project. Workers from survey companies, utility locators, and engineers will gather the data necessary to design the new street, sidewalk and underground utilities. Their personnel should have identification and be in marked vehicles. They will stake the surveyed areas with markers to aid in the design work, so please do not remove the stakes. Once the preparatory work has taken place, the city will host a public meeting to discuss design elements for Southern Belle between River Rd. and Plantation Dr. A separate notification will be sent once the specifics of this meeting are established. We are excited about this opportunity to improve the appearance and surface of this street. If you would like additional information, please don’t hesitate to contact me. Sincerely, Michael Garza, P.E. Civil Engineer Office: 972-304-7019 Fax: 972-304-3570 mgarza@coppelltx.gov