Carter Phase 2-CS 980930
® ~~~
"he City With A Beautiful Future
'.O. BOX 478
:OPPELL, TEXAS 75019
Mr. Greg Hampton
Tri Dal Ltd.
540 Commerce St.
Southlake, TX 76092
817-481-8195 (fax)
September 30, 1998
RE: Carter Addition, Phase II
FILE
P.O. Box 478
Coppell, Texas 75019
972-462-0022
Dear Greg:
Please be advised that awalk-through has been scheduled for Thursday, October 1, 1998 at 9:00
a.m. for the water, sanitary sewer and drainage facilities in the referenced project.
Please ensure that all facilities aze clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call at your earliest convenience.
Sincerely,
Garreth D. Campbel
Construction Inspector
cc: Allana Lamberth, Public Services
Mr. Robert L. Wright, P.E. 214-357-2985 (fax)
gca~neWcarter.wc