Loading...
ST0501-CS121002Deforest rd is still under construction with multiple drops exposed due to no place to bury that won't get cut again. The drop in question is laying down the sidewalk with approx 2 feet crossing from the terminal to the sidewalk on the utility easement at 602 castle creek. From: Rhonda Adloo [mailto:RAdloo@coppelltx.gov] Sent: Monday, October 01, 2012 2:49 PM To: Carter, Shawn Paul Cc: George Marshall Subject: Temp cable in area of 602 Castle Creek/Coppell Shawn, one of your co-workers said you are the one who can handle this issue. The owner of this property reported a temporary line is running across his lot to connect service to another property east of his (not in the same subdivision). His subdivision is Cambridge Manor, his lot is the first one on the east (right) side as you enter from Deforest Rd. which is under construction. He says he cannot have his lawn service mow for this line being in the way. Please do whatever needs to be done to get this temp line out of the way. Rhonda Adloo Administrative Technician City of Coppell Engineering Dept. 972-304-3682 radloo@coppelltx.gov <mailto:radloo@coppelltx.gov> www.zoomerang.com/Survey/WEB22BAT5XXGBE