Coppell Ind 2-CS121005 T H E C I T Y O F
COPPELL
9
A 5 , 8
October 5, 2012
Kerry Roetzel
Hillwood Investment Properties
3090 Olive Street, Suite 300
Dallas Texas 75219
RE: Coppell Industrial Addition,Lot 1R Block A (Tradepoint Two)
PRE-CONSTRUCTION MEETING
Dear Mr. Roetzel:
An onsite pre-construction conference for the referenced project has been scheduled for
Monday, October 8, 2012 at 2:00 p.m.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at(972) 304-7090.
Sincerely,
1 r ••
Rick O'Dell, Construction Inspector
Office Phone: 972-304-7090
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/ owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative