Loading...
Coppell Ind 2-CS121005 T H E C I T Y O F COPPELL 9 A 5 , 8 October 5, 2012 Kerry Roetzel Hillwood Investment Properties 3090 Olive Street, Suite 300 Dallas Texas 75219 RE: Coppell Industrial Addition,Lot 1R Block A (Tradepoint Two) PRE-CONSTRUCTION MEETING Dear Mr. Roetzel: An onsite pre-construction conference for the referenced project has been scheduled for Monday, October 8, 2012 at 2:00 p.m. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at(972) 304-7090. Sincerely, 1 r •• Rick O'Dell, Construction Inspector Office Phone: 972-304-7090 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative