Freeport Xing-CS121008 T H E • C I T Y • O F
COPPELL
X � q
October 8, 2012
Geoff McIntyre
Fast-Trak Construction, Inc.
1150 Empire Central Pl, Ste 124
Dallas TX 75247-4312
RE: Freeport Crossing Parking Expansion
PRE-CONSTRUCTION MEETING RESCHEDULED
Dear Mr. McIntyre:
An onsite pre-construction conference on the referenced project will be conducted
Thursday, October 11, 2012 at 2:00 p.m. at the location of 777 Freeport Parkway, Coppell
TX, 75019.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-7090.
Sincerely,
Da, //
Rick O'Dell, Construction Inspector
Office Phone: 972-304-7090
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COPPELL
6 X S 8 9
October 8, 2012
Geoff McIntyre
Fast-Trak Construction, Inc.
1150 Empire Central Pl, Ste 124
Dallas TX 75247-4312
RE: Freeport Crossing Parking Expansion
PRE-CONSTRUCTION MEETING
Dear Mr. McIntyre:
An onsite pre-construction conference on the referenced project will be conducted
Tuesday, October 9, 2012 at 2:00 p.m. at the location of 777 Freeport Parkway, Coppell
TX, 75019.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-7090.
Sincerely,
Rick O'Dell, Construction Inspector
Office Phone: 972-304-7090
Fax: 972-304-3570
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative