Loading...
Petterson Addn-CS120927 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-200R4-SF-7, Petterson Addition, a zoning change request from PD-200R2- SF-12 (Planned Development-200 Revision 2-Single Family-12) to PD-200R4-SF- 7 (Planned Development-200 Revision 4-Single Family-7), to allow the development of seven (7) single-family lots and two (2) common area lots on 2.27 acres of property located along the north side of West Sandy Lake Road, approximately 130 feet west of Summer Place Drive, at the request of Nancy J. Petterson, represented by Tommy Cansler, Timberland Creek Companies, Inc. STAFF REP.: Matt Steer PROJECT ID# PD-12-0048 DRC DATE: September 27, 2012 and October 4, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.There will be additional comments during detailed engineering plan review. 2.The paving and detention will be the maintenance responsibility of the HOA. This is a huge undertaking for only 7 lots. 3.The utilities will need to be in a minimum of a 25 foot easement. 4.How does the storm drain system work? What are the elevations of the detention pond outfall and the alley? 5.Is the underground detention facility under the fire lane? Can it withstand a fire truck load? 6.The City’s hammerhead fire lane detail shows a 150 foot "head". This width needs to be met. 7.Remove the note under the typical pavement section that says refer to City of Coppell detail. 8.Provide easements for the fire hydrants. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Petterson Addition, Lots 1R-7R & 1XR-2XR, Block A, Replat , being a replat to establish seven (7) single-family lots, two (2) common area lots and easements on 2.27 acres of property located along the north side of West Sandy Lake Road, approximately 130 feet west of Summer Place Drive, at the request of Nancy J. Petterson, represented by Tommy Cansler, Timberland Creek Companies, Inc. STAFF REP.: Matt Steer PROJECT ID# RP-12-0049 DRC DATE: September 27, 2012 and October 4, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.There will be additional comments during detailed engineering plan review. 2.The paving and detention will be the maintenance responsibility of the HOA. This is a huge undertaking for only 7 lots. 3.The utilities will need to be in a minimum of a 25 foot easement. 4.How does the storm drain system work? What are the elevations of the detention pond outfall and the alley? 5.Is the underground detention facility under the fire lane? Can it withstand a fire truck load? 6.The City’s hammerhead fire lane detail shows a 150 foot "head". This width needs to be met. 7.Remove the note under the typical pavement section that says refer to City of Coppell detail. 8.Provide easements for the fire hydrants.