Loading...
Duke Lesley L1&2-CS121004 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-221R7-HC, Duke Lesley Addition (RaceTrac), a zoning change request from PD-221R3-HC (Planned Development 221-Revision 3-Highway Commercial) to PD-221R7-HC (Planned Development 221-Revision 7-Highway Commercial), to amend the Concept Plan on 17.4 acres and to attach a Detail Site Plan on 1.8 acres to allow the development of a 5,928-square-foot convenience store with eight (8) pump islands on property located at the northwest corner of South Belt Line Road and I.H. 635 at the request of Frisco 5 Ventures LP (RaceTrac Petroleum), being represented by Gladys Bowen, Masterplan Consultants. STAFF REP.: Matt Steer PROJECT ID# PD-12-0050 DRC DATE: September 27, 2012 and October 4, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.There will be additional comments during detailed engineering plan review. 2.We will need more information regarding the traffic signal (warrant study, impact analysis. etc..) 3.The fire line loop will need to be private. 4.Additional ROW may be required for the decel lanes and sidewalks. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke Lesley Addition, Lots 1R1 & 1R2, Block C, Replat, being a replat of Lot 1, Block C, of the Duke Lesley Addition to establish fire lane, mutual access and utility easements to allow the development of a 5,928-square-foot convenience store with eight (8) pump islands on Lot 1R2 containing 1.9 acres of property and Lot 1R1 containing 15.5 acres being reserved for future development, located at the northwest corner of South Belt Line Road and I.H. 635 at the request of Frisco 5 Ventures LP (RaceTrac Petroleum), being represented by Gladys Bowen, Masterplan Consultants. STAFF REP.: Matt Steer PROJECT ID# RP-12-0051 DRC DATE: September 27, 2012 and October 4, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.There will be additional comments during detailed engineering plan review. 2.We will need more information regarding the traffic signal (warrant study, impact analysis. etc..) 3.The fire line loop will need to be private. 4.Additional ROW may be required for the decel lanes and sidewalks.