Loading...
Vista Ridge ER-CS120726 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-228R4-HC, Vista Ridge Retail, Lot 3R, Block A, (Freestanding Emergency Room), a zoning change request from PD-228-HC (Planned Development-228- Highway Commercial) to PD-228R4-HC (Planned Development-228 Revision 4- Highway Commercial), to attach a Detail Plan to Lots 3 and 4 to allow a 14,000- square-foot medical facility on approximately 1.8 acres of property located on the north side of S.H. 121 approximately 400 feet east of Denton Tap Road, at the request of Coppell ED MOB, LLC, being represented by Namer Kaim, Kaim Associates, Inc. STAFF REP.: Matt Steer PROJECT ID# PD-12-0036 DRC DATE: July 26, 2012 and August 2, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.The domestic water will need to come off of the 8” main. 2.You do not need an additional vault, a stub out was provided to this lot for fire protection. 3.A 6’ sidewalk will be required adjacent to SH 121. 4.There is an $11,179.00 pro rata fee for the water line in addition to the impact fees. 5.There may be additional comments during detailed engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Vista Ridge Retail Amended, Lot 3R, Block A, Replat, being a replat of Lots 3 and 4, Block A into Lot 3R, of the Vista Ridge Retail Addition to establish necessary easements and fire lanes to allow a 14,000-square-foot medical facility on approximately 1.8 acres of property located on S.H. 121 approximately 400 feet east of Denton Tap Road, at the request of Coppell ED MOB, LLC, being represented by Namer Kaim, Kaim Associates, Inc. STAFF REP.: Matt Steer PROJECT ID# RP-12-0037 DRC DATE: July 26, 2012 and August 2, 2012 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There is an $11,179.00 pro rata fee for the water line in addition to the impact fees. 2. There may be additional comments during detailed engineering plan review. 3. Clean up the plat – change scale to match site plan, remove pavement, add old lot line “to be removed by this plat.”