Cambridge Phase 2-CS 970513To:
From:
RE:
Date:
Matt Cast, Supt. of Public Services
Travis Crump, Interim Fire Marshal
Atul Pate~ Engineer
Larry D~nstmction Inspector
WALK-THRU for Cambridge Manor Phase H
May 13, 1997
A walk-thru for paving and utilities on the referenced project has been scheduled for
Friday, May 16, 1997 at 8:00 a.m.
If I can be of further assistance please let me know.
file/ldavis/0walkthru.mm