Loading...
Cambridge Phase 2-CS 970513To: From: RE: Date: Matt Cast, Supt. of Public Services Travis Crump, Interim Fire Marshal Atul Pate~ Engineer Larry D~nstmction Inspector WALK-THRU for Cambridge Manor Phase H May 13, 1997 A walk-thru for paving and utilities on the referenced project has been scheduled for Friday, May 16, 1997 at 8:00 a.m. If I can be of further assistance please let me know. file/ldavis/0walkthru.mm