Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Royal Oaks-LR111031 (3)
Conaster Tri—Star Tri-Star Pipe TX Inspection Tri-Star TX 76003 Tel:817-319-7793,Fax:817-563-6200 PROJ INFO PROJ NAME: PROJECT NUM: RESPONSIBLE: DATE Royal Oaks-Coppell 10/31/2011 CLIENT Conaster RESPONSIBLE: Scott y DEPARTMENT: PO BOX: (/ STREET: CITY, ST ZIP: � � 5-ti4 TELEPHONE: /C G FAX: MOBILE: E-MAIL: PROJ MGR Conaster Construction RESPONSIBLE: DEPARTMENT: PO BOX: STREET: CITY, ST ZIP: TELEPHONE: FAX: MOBILE: 817-919-9087 E-MAIL: CONTRACTOR Tri-Star Pipe Inspection RESPONSIBLE: Tom Lewis DEPARTMENT: PO BOX: PO Box 172015 STREET: CITY, ST ZIP: Arlington, TX 76003 TELEPHONE: 817-319-7793 FAX: 817-563-6200 MOBILE: 817-319-7793 E-MAIL: tom @tristarpipeinspection.com Conaster-Royal Oaks-Coppell.mdb // PAGE:1 Conaster Try-Star Tri-Star Pipe Inspection r Arlington,TX 76003 Tel:817-319-7793,Fax:817-563-6200 INSPECTION REPORT DATE: WORK#: WEATHER: OPERATOR: SECTION NR: SECTION NAME 10/31/2011 sunny,dry cl/dc 1 Line A PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: 0 STREET: Heartz Rd MAP#1: MH: 8+60 CITY: Coppell MAP#2: MH: 6+36.75 LOCALE: street area TAPE#: 1 TV'D LGTH: 220.65 ft INSPECT REASON: new inspection PIPE SIZE 8" SECTION TYPE: waste MATERIAL: polyvinyl chlorid JT LGTH: 20ft LINING: AREA: area 1 RSRVD: REMARK: 1:550 POSITION OBSERVATION 8+60 2.00 inspection begins at upstream manhole 72.80 service connection,at 10 o'clock () () I 157.55 service connection,at 10 o'clock 3+36.75 220.65 inspection ends at downstream manhole Conaster-Royal Oaks-Coppell.mdb // PAGE:2 Conaster • Tri-Star Tri-Star Pipe Inspection Arlington,TX 76003 Tel:817-319-7793,Fax:817-563-6200 INSPECTION REPORT DATE: WORK#: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 10/31/2011 sunny,dry cl/dc 2 Line A PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: 0 STREET: Serenity Ct. MAP#1: MH: 3+80.03 CITY: Coppell MAP#2: MH: 6+36.75 LOCALE: street area TAPE#: 1 TV'D LGTH: 254.65 ft INSPECT REASON: new inspection PIPE SIZE: 8" SECTION TYPE: waste MATERIAL: polyvinyl chlorid JT LGTH: 20ft LINING: AREA: area 1 RSRVD: REMARK: 1:625 POSITION OBSERVATION +80.03 2.00 inspection begins at downstream manhole 33.80 service connection,at 10 o'clock 1 98.10 service connection,at 09 o'clock f S S 156.25 service connection,at 09 o'clock 222.35 service connection,at 10 o'clock +36.75 254.65 inspection ends at upstream manhole Conaster-Royal Oaks-Coppell.mdb // PAGE:3 Conaster T •Tri-Star Tri-Star Pipe Inspection j Arlington,TX X 76 76003 3 Tel:817-319-7793,Fax:817-563-6200 INSPECTION REPORT DATE: WORK#: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 10/31/2011 sunny,dry cl/dc 3 Line A PRESENT: VEHICLE: CAMERA: PRESET: CLEANED: RATE: 160 STREET: Serenity Ct. MAP#1: MH: 3+80.03 CITY: Coppell MAP#2: MH: 0+00 LOCALE: street area TAPE#: 1 TV'D LGTH: 378.95 ft INSPECT REASON: new inspection PIPE SIZE: 8" SECTION TYPE: waste MATERIAL: polyvinyl chlorid JT LGTH: 20ft LINING: AREA: area 1 RSRVD: REMARK: 1:925 POSITION OBSERVATION c+80.03 2.00 inspection begins at upstream manhole C\ 62.70 service connection,at 02 o'clock 93.35 service connection,at 10 o'clock C\ 129.15 service connection,at 02 o'clock 160.20 service connection,at 10 o'clock 198.10 service connection,at 02 o'clock 221.70 service connection,at 09 o'clock C\ 263.75 break-in-connection,at 03 o'clock C\ 332.45 service connection,at 03 o'clock \— 0+00 378.95 inspection ends at downstream manhole Conaster-Royal Oaks-Coppell.mdb // PAGE:4