Cambridge Phase 2-CS 970507P ;)2
DEVELOPMENT, INC~.
May 7, 1997
Mr. Larry Davi~
City of Cobb. Il
F:,ngineermg Dept
Po*;t Offiu~ Boa 478
Copt~ll, Tex~ 75019
Reference ou~ mccthtg, this morning, on 'lime Estat~ of Cambridge Manor, Phase 11
rega~-dhq{ d,e following items being corrected prior to our final waik-Ouu on Tu~:lay,
May 13th. ~ 997.
a. Hags lmve been placed where a portion of Castle Creek
Drive will be ~'.-smfaced to insure proper drainage.
TAROET DATE FOR COMPLETION OF THIS ITEM 15
FRIDAY, MAY 9th, 1997.
Per your request, ~ilt fencing will be in,tailed between lots
2, 3, 4 & 5 of block "A'' and "B". Additionally, silt fencing
win be inatal]od on the northwe~l corner of Phase
TAKOET DATE FOR COMPLETION OF THIS ITEM
EOVFURDAY, MAY 1 lth, 1997.
c. Per your request, a 3-i slope will be created north of the
sidewalk amd south of the six-acre lake.
TARGET DATE FOR COMPLETION OF THIS ITEM IS
SATURDAY, MAY llth. 1997.
d. The I kt" water meter will be installed to servic~ tim new
in~ation aystem around the six-acre lake.
TARGET DA'rE FOR COMPLETION OF THIS ITEM IS
MAY 30d,, 1907.
POST OFFICE 80x ~a~2 COI~LL. 'rEXA6 75019
I.nn'y
Final Walk-thru
May 7. 1997
- Page Two -
Larry. in closing. ! will call you on Monday. May 12th. 1997 to ~hedule the final walk-thru
on Tuesday. May 13th. 1997. If you have any questions, whato, oever, regarding any item or
items in thi$ letter and attached plat. please feel free to call me nnytime ~. 214/908-1068.
Sincerely,
I Arch: Plat of Ph~¢ I1
CC:
O.W. MuDonald
I}avid Carle~on
~aml~y Hurchctt
P El4
..._.POND( TO PHASE
266.20'
THE E8TATES OF OAMBRIDOE MANOR - PHA8E II