Loading...
Cambridge Phase 2-CS 970418P o2 April 1.8, 1997 DEVELOPMENT, lNG. I )avid Cazlu)n DOWDEY. ANDERSON EN(3LNEERING 16250 Dallas Parkway, Suite No. 100 l)all~s. Tenas 752a8 This momlng I mut Lan'y Davis, City of Coppell Engineering Inspector, on our second phase of The F. alales of Cambridge Manor for a pre 'hminaty final walk-thru so that we may request, in wriths&, a t'ma] walk-thru with 'IRe City of Coppell. Dutin8 tbiz walk-thru the following items were addn~ed and will require you to cont~ct Rodman Excavation to have these items corrected per 'l/to City: Erosion coatn)l and/or silt fencing will be requited between lots Ln effort to prevent drainage ftum runnin& into Castle Creek Drive, These will nm north & sou~ and must be installed prior to the Final walk-thru, Erosion control ami/or silt 'fencing will be required on the east and wcat enlrance of Phase il. On the west side ot' (htstle Creek Drive a piece of equipment was stuck and had ua be towed. This has caused four or five deep ruLs ~ mu.st be filled and graded prior to the start of our enttT featu~, On the wmt side of Castle Creek l~ive due ~outh of the above mentioned rula, larse chunks of asphalt from Deforest Road have been displaced ~ mL~qt Ix~. repaired. We will need to vertify paving elevations prior to the final walk-thru, Hand rake and brin& in a box-blade to evenly srade the east and west side or Castle Creek Drive @ the cmr~ce. 'Hte temporary truck efltt~ce located on the east side of Castle Creek Drive needs to be removed and graded prior to the final walk-thru. lland dre~ia8 and final sUeet cleaning needs to be accomplished prior to the final w'dlk..thru. Verify sr~de of the slope due noah of the new sidewalk lhat was just potucxl on the south end of the lake. PO$'f OFFICE ~OX 2312 (X~I~LL. ~ 75Ole David Carlton Prelimin~ Walk-thru April 18th, 1997 Page Two - 10. Drainage on the west lots has been addressed and Mr. & Mrs Elders (prop~y owner~ due we~t of Phase H) are s&~fied with the results of our drainage ditch on the rear of lots 1-5 of Block "A". However, Mr. Davia wa~ us to be sure that there is proper drainage on the east lots as well, e~pecially on lm$ of Block "B", There will also be a new drainage ditch dug on the rear of the e, mt lots p~r my meeting in Sanuary o[ this year with Atul Panel and Larry Davis. Additionally. we will necd to furni.sh The City with the folowing: a. 'As buil~ pi-,,--". b. Utility contractor ks requirod to post & utility bond. c. Pavin8 covtractor ia required to post a paving bond. d. Erosion Cx~ntrol Maintenance Letter. David, ple, a,~ contact Rodman Excavation or tho various contractors direct to make them aware of theae items so that they can be addre~ed immediately. Please call me Monday. April 2lst, 1997, with ma update on each of these ilerns. Sh~ccrcly, I Alt;h: Phat~ II Phd e~.: O. W. McDonald Doug Stevens (City of Coppetl Engineering Dept) Larry Davis (City of (k-~ppell Engineering Del)t) P 84 I' TO PHASe' * 266,20' OAITLE CREEK DR. (13.~71 8,F.) ' (Ig,~il2 8.F.) .. 4 8.F.) I 8.F.) 10t,$4' (1;.866 ti.i:.) (,,~! loe.4t1' o ~o 40 go go lg11.52' I $';')1 8GALE: 1'-~0'-0' 80.00' II.L, (,,) (1J,4$e. S.F.) IOip.15' (11,401 8.F.) lO.Or THE ~, qo DEFOREST LANE ~$6.$~' ESTATE8 OF OAMBRIDGE MANOR - PHASE II