Old Town 1C (13)-CS121018 T H E • C I T Y O F
COPPELL
rte - o
October 18, 2012
Mr. Greg Yancey
Provident Company
RE: Old Town Addition Lot 1C Cottage 13
Fee Assessment Letter
Dear Mr. Yancey:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
In accordance with the Development Agreement for this project, the city has waived all fees other than the
meter costs and the meter deposit. The meter costs are a pass through cost, and the deposit is for the
water account. These costs will be payable to our Building Inspections Department when each residence
is permitted, and the meter picked up.
If you have any questions, please contact me.
Sincerely,
• is a- P a, P.E
Civil Engineer
cc: Jennifer Miller, Finance Director
Amy Swaim, Administrative Technician, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Tim Oates, Deputy Chief/Prevention
Brad Reid, Director of Parks and Recreation
Michael Arellano, Chief Building Official
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Old Town Addition Lot IC Block
Date: 10/17/2012
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $0.00
(100%due at Issuance of Building Permit)
Water Tap Inspection Fee $0.00
(100%due at Issuance of Water Meter)
Water Meter Fee(Domestic) $299.25
(100%due at Issuance of Water Meter)
Water Meter Fee(Irrigation/Fireline) $299.25
(100%due at Issuance of Water Meter)
Water Meter Deposit(Domestic) $30.00
(100%due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100%due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100%due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100%due at Issuance of Building Permit) _
Utility Final Inspection Fee $0.00
(100%due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100%due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100%due prior to Filing Plat)
Street Light Fee $0.00
(100%due prior to Acceptance of Project)
Street Sign Fee $0.00
(100%due prior to Acceptance of Project)
Construction Inspection Fee $0.00
(100%due prior to Start of Construction)
TOTAL $658.50
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00
Fees waived per development agreement:
Water Impact Fee $3,006.00
Water Tap Inspection Fee $100.00
Wastewater Impact Fee $1,503.00
Wastewater Tap Inspection Fee $50.00
Utility Final Inspection Fee $50.00
Park Fee $0.00
Roadway Impact Fee $1,501.50
Total Fee Waiver $6,210.50
DEVELOPMENT FEE WORKSHEET
PROJECT: Old Town Addition Lot 1C Block A
DATE: 10/17/2012
Water Impact Fee:
Domestic Meter(s): 1 - 1 inch = 1.67 ESU's
Irrigation Meter(s): 1 - 1 inch = 1.67 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total#: 3.34 ESU's @$900.00 ea. $3400600
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total#: 2 Connections @$50.00 ea. $400.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total#: 1 Domestic Meter(s) @ $299.25 $299.25
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total#: 1 Irrigation Meter(s) @ $299.25 $299.25
Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total#: 0 Fireline Meter(s) @ $0.00 meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total#: 1 Meter(s) @$30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total#: 1 Meter(s) @ $30.00 ea. $30.00
(100%due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 1.67 @$900.00 ea. $17503.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total#: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee(All developments):
Total#: 1 Lots @$50.00 ea. $50.00
(100%due prior to issuance of building permit)
Park Fee(For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100%due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2%of development cost required for private improvements)
(4% of development cost required for public improvements)
** All fees waived per Development Agreement
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Old Town Addition Lot 1C Block A
DATE: 10/17/2012
ROADWAY IMPACT FEE:
Service Area * 1
Category** Office
Land Use** General Office Building
Building Area(sf) 1,400
Development Units** 1.40
Vehicle Miles per Development Unit** 7.15
Fee per Vehicle Mile *** $150
Roadway Impact Fee due=(Development Units)x
(Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $1,501.50
*(Figure 4.1 -Roadway Impact Fee Study)
**(Table 4.10-Roadway Impact Fee Study)
***(Schedule 2,Page 3 -The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 100%
Total Credit $1,501.50
** Credit applied per Development Agreement