Signature-LR120905 American Rehab & Inspections, INC. (214) 536-2915 LOW PRESSURE AIR TEST FOR GRAVITY SANITARY SEWER Test Procedures : Each section of sewer shall be tested between successive manholes. Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached. At that time the flow of air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi gauge for at least two(2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pressure in the pipe shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found,the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table,the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table,the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed A 3+03-0+97 8" 203 7Min. Yes Yes 0+97-0+60 8" 33 7Min. Yes Yes 0+60-0+00 8" 57 7Min. Yes Yes Contractor: Huffman Date: 9/5/12 Project: River Oaks Assisted Living Job#: Location: Tested By: Oscar Inspector: Rick O'Dell City Of: Coppell American Rehab & Inspections, Inc. 3039 Parr Lane Grapevine,Texas 76051 972-488-3042 Project Project Name River Oaks Assisted Location Easement Living Date 9/5/2012 Direction Of Survey Downstream City Coppell PO Number Run Number Purpose Pre-Acceptance Operator Name John Henry Completed Yes Comments Pipe Asset ID Line A @ .34% Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 203.3 Year Laid Year Renewed Sewer Use Sanitary Manhole Start MH Number 3+03 Start MH Depth Start MH Location Start MH Notes End MH Number 0+97 End MH Depth End MH Location End MH Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number 004 Contractor Name Huffman Weather Dry VCR Start Index 00:04:47 VCR End Index 00:00:00 Company American Rehab Cell 214-536-2915 and Inspections Office 972-488-3042 Dallas, Texas Fax 972-488-3142 Created with the 5M report generator Project Name: River Oaks Assisted Living Date: 9/5/2012 Asset ID: Line A @ .34% Location: Easement Start MH Number: 3+03 Length Surveyed: 203.3 End MH Number: 0+97 Run Number: Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 3+03 (3.0) - Begin Survey (203.3) - End Survey Total Distance: 203.3 ID Number: 0+97 m, Created with the report generator Project Name: River Oaks Assisted Living Date: 9/5/2012 Asset ID: Line A @ .34% Location: Easement Start MH Number: 0+60 Length Surveyed: 32.6 End MH Number: 0+97 Run Number: Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 0+60 (3.1) - Begin Survey (32.6) - End Survey Total Distance: 32.6 ID Number: 0+97 Created with the aUPOSM report generator Project Name: River Oaks Assisted Living Date: 9/5/2012 Asset ID: Line A @ .34% Location: Easement Start MH Number: 0+60 Length Surveyed: 57.3 End MH Number: 0+00 Run Number: Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 0+60 (3.0) - Begin Survey (10.5) - Lateral At 12 Oclock (57.3) - End Survey Total Distance: 57.3 ID Number: 0+00 Created with the P- -OISTO report generator