Loading...
ST1002-LR120720 (2) Utility & Environmental Services, Inc. PO Box 542015 Dallas, TX 75354 Office: 972-556-2913 Fax: 972-556-1614 Job Information: Contractor's Name: KCK Utility Construction Project Name: Old Town Coppell & Bethel Rd Infrasture Improvement "Storm" Inspector: Rick O'Dell TV Date: 7/20/2012 By: Omar Hurtado Description 1 - DVD I -Run Sheet Report % Utility & Environmental Services, Inc. "A '... inspccti n a '( actor CCcain ng ii ncl Safety P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project OLD TOWN COPPELL Project Name &BETHEL RD Location BETHEL ROAD INFASTRUCTURE IMPROV Date 7/20/2012 11:51 Direction Of Survey Upstream City COPPELL,TX PO Number Run Number 1 Purpose Pre-Acceptance Operator Name HURTADO Completed Yes Comments Pipe Asset ID RE-TV AFTER REPAIR Pipe Size 21" (LINE M) Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 375.6 Year Laid Year Renewed Sewer Use Stormwater Manhole Upstream MH Number 6+29(CURB INLET) Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 2+50(MH) Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No Other Media Number #1 Truck Number TV TRUCK#15 Contractor Name KCK UTILITY Weather Dry CONSTRUCTION VCR Start Index VCR End Index Created with the -;;Tosrvi report generator Project Name: OLD TOWN COPPELL & BETHEL RD Ell INFASTRUCTURE IMPROV Light Date: 7/20/2012 11:51:00 AM Asset ID: RE-TV AFTER REPAIR (LINE M) ILAer-ate Location: BETHEL ROAD Upstream MH Number: 6+29(CURB INLET) Length Surveyed: 375.6 Downstream MH Number: 2+50(MH) Hear; Run Number: 1 Direction Of Survey: Upstream Pipe Size: 21" Pipe Material: Reinforced Concrete Pipe `'ere ID Number: 2+50(MH) (6.0) SI - Start Inspection (375.6) El - End Inspection Total Distance: 375.6 0 ID Number: 6+29(CURB INLET) Created with the a report generator % Utility & Environmental Services, Inc. TV 1 I11Spection " '( i1Ctc1 CI-calmly 'lle'11Cfi Safety P.O. Box 542015 1965 California Crossing Dallas, Texas 75354 972-556-2913 Fax 972-556-1614 Project OLD TOWN COPPELL Project Name & BETHEL RD Location BETHEL ROAD INFASTRUCTURE IMPROV Date 7/20/2012 12:35 Direction Of Survey Downstream City COPPELL,TX PO Number Run Number 2 Purpose Pre-Acceptance Operator Name HURTADO Completed Yes Comments Pipe Asset ID Pipe AFTER REPAIR Pipe Size 36" & 48" (LINE M) Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 112.3 Year Laid Year Renewed Sewer Use Stormwater Manhole Upstream MH Number 2+50(MH) Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 1+56 Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow NONE Signs Of Surcharge No Other Media Number #1 Truck Number TV TRUCK#15 Contractor Name KCK UTILITY Weather Dry CONSTRUCTION VCR Start Index VCR End Index Created with the <� report generator Project Name: OLD TOWN COPPELL & BETHEL RD Erl INFASTRUCTURE IMPROV Light Date: 7/20/2012 12:35:00 PM Asset ID: RE-W AFTER REPAIR (LINE M) „=lrratr Location: BETHEL ROAD Upstream MH Number: 2+50(MH) Length Surveyed: 112.3 Downstream MH Number: 1+56 Heavy Run Number: 2 Direction Of Survey: Downstream Pipe Size: 36" & 48" Pipe Material: Reinforced Concrete Pipe ID Number: 2+50(MH) (6.0) SI - Start Inspection (58.9) - LATERAL - Position: 9 (68.8) - LATERAL - Position: 3 (112.3) El - End Inspection . CONNECTION Total Distance: 112.3 ID Number: 1+56 Created with the report generator