Ridgecrest-CL121019 City of Coppell
Department of Public Works
Work Order Summary
Work Order ID WOTC-12-4474 Initial Date 10/19/2012
Category Traffic Control Start Date
Type Signs and Markings Final Date 10/19/2012
Assigned To Cody Wildoner
Address Lodge Rd
Cross Street Sandy Lake Rd
Location Street
Description Damage to sign&pull box
Comments Replaced damaged pole&damaged pull box lid.
Equipment
Date Description Quantity Unit Cost Per Extended Cost
10/19/2012 Bucket Truck 1 10 Hour $10.00
Equipment Subtotal $10.00
Parts
10/19/2012 Poles 1 23.4 Each $23.40
10/19/2012 Pull box lids 1 68.6 Each $68.60
Parts Subtotal $92.00
Personnel
10/19/2012 Cody Wildoner 1 15 Hour $15.00
10/19/2012 Robert Offield 1 15 Hour $15.00
Personnel Subtotal $30.00
Work Order Total $132.00