Loading...
Ridgecrest-CL121019 City of Coppell Department of Public Works Work Order Summary Work Order ID WOTC-12-4474 Initial Date 10/19/2012 Category Traffic Control Start Date Type Signs and Markings Final Date 10/19/2012 Assigned To Cody Wildoner Address Lodge Rd Cross Street Sandy Lake Rd Location Street Description Damage to sign&pull box Comments Replaced damaged pole&damaged pull box lid. Equipment Date Description Quantity Unit Cost Per Extended Cost 10/19/2012 Bucket Truck 1 10 Hour $10.00 Equipment Subtotal $10.00 Parts 10/19/2012 Poles 1 23.4 Each $23.40 10/19/2012 Pull box lids 1 68.6 Each $68.60 Parts Subtotal $92.00 Personnel 10/19/2012 Cody Wildoner 1 15 Hour $15.00 10/19/2012 Robert Offield 1 15 Hour $15.00 Personnel Subtotal $30.00 Work Order Total $132.00 October 23,2012 1