Loading...
Villas at LV 2-CS121022 T H • C I T Y O F comiL T � 5 � 9 A 5 October 22, 2012 J. Casey Ross, P.E. Dowdey, Anderson & Associates 5225 Village Creek Dr., Suite 200 Plano TX 75093 RE: Villas At Lake Vista, Phase 2 Plan Review Comments (1St submittal) Dear Mr. Ross: The City of Coppell Engineering Department has reviewed the referenced plans and has the following comments to offer: General- 1. All work in city of Lewisville right-of-way will need to be coordinated with them, including the fire hydrants, driveways, water meters, storm drain, etc. 2. Submit to us copies of any approved permits from city of Lewisville. Paving- 3. If you are using a mountable curb, you will need 30' back to back or 27' gutter to gutter. 4. You will need 24' gutter to gutter around the island on Calcot Drive as shown on the plans and there will not be parking allowed around lot 1X. Utilities- 5. Irrigation meters? If so, the fee assessment will be revised to reflect that. 6. Sanitary sewer lids must be 30". 7. Our ordinance requires a looped water line. We do not allow the dead end over 150'. Remove the 300'+- feet of waterline between lots 1 and 11. Our public works department prefers not to have a waterline between houses. Loop from Calcot to Snowshill instead. 8. Make sure manholes, meters and fire hydrants are out of the sidewalks and barrier free ramps. There may be additional comments throughout the plans that need to be addressed. The City of Coppell has reviewed the plans for the referenced addition which will be approved with the comments above addressed. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Micha-1 Garza, P.E. Civil Engineer Office Phone: (972) 304-7019 Fax: (972) 304-3570 mgarza @coppelltx.gov