Loading...
Tax 2012C-CS121025Can you put this email in tax 2012C folder in laserfische, you don’t have to put the invoice. Thanks, Mike Michael Garza, P.E. Civil Engineer City of Coppell 972-304-7019 From: Kevin Shepherd [mailto:kevin@verdunity.com] Sent: Thursday, October 25, 2012 11:33 AM To: Michael Garza Cc: Kristin Green Subject: Southern Belle - Monthly Invoice & Progress Report Mike, I'm attaching our invoice for work completed through 10/19/12. Here's a progress report on where we're at. We're on track to have 30% design completed by 11/2, and are looking at making our 60% submittal in early December. If you have any questions, please give me a call. Thanks! Work Completed Last Period (9/11/12-10/19/12) * Boundary & Topo Survey Work Completed * Checked Survey and Created Base Files * Set horizontal alignment and ran existing ground profiles and cross-sections * Started conceptual design Work Ancipated for Current Period * Conceptual roadway design (proposed profile & cross sections) * Preliminary drainage analysis * Preliminary utility (water and sanitary sewer) design * 30% Design Review Meeting w/ City Items Requiring Assistance from City * We'd like to meet with you the week of Nov 5 to review the conceptual design and discuss any design issues (if any) before proceeding with the Preliminary Design Submittal * Results of Storm Sewer System Condition Assessment Kevin Shepherd, PE, ISI ENV-PV Principal VERDUNITY 214-425-6720 www.verdunity.com <http://www.verdunity.com/>