Carter Phase 2-CS 971208 ~ /~-~, The City With A Beautiful Future December 8, 1997 Robert L. Wright, P.E. Needham Wright Engineers, Inc. 10290 Monroe Dr., Suite 30S Dallas, TX 75229 RE: Carter Addition, Phase II Development Fee Assessment Dear Mr Wright: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $15,200.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so thc construction inspection fee can bc verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, t~ Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: Carter Addition, Phase H DATE: 12/8/97 Water Impact Fee: Domestic Meter(s): 5 - 5/8 inch X 3/4 inch 5 ESU's Irrigation Meter(s): ESU's ESU's Fireline Meter(s): ESU's Total #: 5 ESU's @ $450.00 ea. $2,250.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 8: 5 Connections @ $50.O0 ea. 8250.O0 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: § Domestic Meter(s) @ 824.14 8120.70 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 0 Irrigation Meter(s) @ 80.00 Total #: 0 Additional Irrigation Meter(s) @ 80.00 Total #: 0 Fireline Meter(s) @ 80.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 5 Meter(s) @ 830.00 ea. 8150.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ 835.00 ea. 80.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ 8450.00 ea. 82,250.00 Wastewater Tap Inspection Fee: Total #: 5 Connections @ 850.00 ea. 8250.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 5 Lots @ 850.00 ea. 8250.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 5 Single-family @ $1285.00 / Lot $6,425.00 __. N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $4,275.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 DEVELOPMENT FEE TABLE Project: Carter Addition, Phase H Date: 12/8/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Water Tap Inspection Fcc $250.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $120.70 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) '. $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $150.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $250.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $250.00 (100% due at Issuance of Building Permit) Park Fee $6,425.00 $6,425.00 (100% due prior to Council Approval) Roadway Impact Fee $4,275.00 $4,275.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $16,220.70 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $15,200.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Carter Addition, Phase H DATE: 12/8/97 ROADWAY IMPACT FEE: Service Area * 6 I Category ** Residential I Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 5 Vehicle Miles per Development Unit ** 2.85 I Fee per Vehicle Mile *** $300 [ Roadway Impact Fee due = (Development Units) x [(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $4,275.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)