Loading...
Town Center BP-LR001026 IN-PLACE DENSITY !;STING Fir ENGINEERING,INC. a division of irerracan 8901 Carpenter Frwy.,Suite#100 Dallas,Texas 75247 Date of Service: 10/20/2000 Report No.: 0027507 Report Date Client No.: 2696 Project No.: 94001422 10/26/2000 Client: Excel Group, Inc. Project: Town Center Business Park Attn: Bryan Peck 205 West Parkway Blvd 2639 Walnut Hill Ln #218 Dallas TX 75229 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test Method: Excel • ASTM D-698 ASTM D2922 ASTM D3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture% Density pcf Moisture Density 1 Lt. brown silty clayey sand 14.5 113.5 -2/+2% 95% FIELD DENSITY TESTS TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. (%) (pcf) (%max) Building Pad 5 33'W of E, 28'N of S 6" 1st 1 12.8 107.9 95 6 45'W of E, 12'N of S 6" 1st 1 13.2 108.3 95 7 18'WofE, 9'NofS 6" 1st 1 14.9 108.1 95 8 21'WofE, 30'NofS 6" 1st 1 14.7 107.6 95 9 9'WofE, 12'NofS 6" 2nd 1 12.5 108.7 96 10 21'WofE, 28'NofS 6" 2nd 1 12.8 110.2 97 11 35'W of E, 15'N of S 6" 2nd 1 13.6 109.8 97 12 39'W of E, 35'N of S 6" 2nd 1 12.7 109.0 96 Test results on this report meet project specification. Second Trip: 3 :00 p.m. to 4:00 p.m. Field Results Reported To: Contractor L i Technician: Roy Montgomery Started: 6:30a Finished: 8:OOa I- n'� g, „,C. Report Distribution: (1)Excel Group,Inc. (I)City of Coppell-Engr Dept ric J. Cleveland,P.E. (1)City of Coppell-Bldg Insp Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering,Inc. 07SDS Page 1 of 1