Loading...
Cambridge Phase 2-CS 961127The City With A Beautiful Future P,O. Box 478 Coppell, Texas 75019 214-462-0022 November 27, 1996 Bill Anderson Dowdey, Anderson & Associates 16250 Dallas Parkway, Suite 100 Dallas, TX 75248 The Estates of Cambridge Manor, Phase II Development Fee Assessment Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $30,850.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. AKe I~[e [h~~a/~n~n~g!~/E~ ity Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: The Estates of Cambridge Manor, Phase H 11/27/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,950.00 $4,950.00 (100% due prior to Council Approval) Water Tap Inspection Fee $550.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $232.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $23.21 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $300.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $500.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $500.00 (100% due at Issuance of Building Permit) Park Fee $12,850.00 $12,850.00 (100% due prior to Council Approval) Roadway Impact Fee $8,550.00 $8,550.00 (100 % due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee $5,787.49 TOTAL $38,777.80 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $30,850.00 ELOPMENT FEE WORKSHEI::I' PROJECT: The Estates of Cambridge Manor, Phase H DATE: 11/27/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 10 - 5/8 inch X 3/4 inch -- 10 ESU's 1 - 5/8 inch X 3/4 inch -- I ESU's = ESU's 0 - N/A = ESU's Total #: 11 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 11 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 10 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $23.21 Water Meter Deposit Fee (Domestic): Total #: 10 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 10 @$450.00 ea. $4,950.00 $550.00 $232.10 $23.21 $0.00 $0.00 $300.00 $35.00 $4,500.00 Wastewater Tap Inspection Fee: Total #: 10 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 10 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $500.00 $500.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 10 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $12,850.00 N/A $8,550.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $5,787.49 Page 2 RoADWAy IMPACT FEE CALCULATIoNs PROJECT: DATE: The Estates of Cambridge Manor, Phase H 11/27/96 ROADWAY IMPACT FEE: ;ervice Area * 2 Residential Category ** and Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = Single-Family Detached N/A 10 2.85 $300 $8,550.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)