Cambridge Phase 2-CS 961127The City With A Beautiful
Future
P,O. Box 478
Coppell, Texas 75019
214-462-0022
November 27, 1996
Bill Anderson
Dowdey, Anderson & Associates
16250 Dallas Parkway, Suite 100
Dallas, TX 75248
The Estates of Cambridge Manor, Phase II
Development Fee Assessment
Dear Mr Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $30,850.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
AKe I~[e [h~~a/~n~n~g!~/E~ ity Engineer
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project:
Date:
The Estates of Cambridge Manor, Phase H
11/27/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,950.00 $4,950.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $550.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $232.10
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $23.21
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $300.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $500.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $500.00
(100% due at Issuance of Building Permit)
Park Fee $12,850.00 $12,850.00
(100% due prior to Council Approval)
Roadway Impact Fee $8,550.00 $8,550.00
(100 % due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee $5,787.49
TOTAL $38,777.80
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $30,850.00
ELOPMENT FEE WORKSHEI::I'
PROJECT: The Estates of Cambridge Manor, Phase H
DATE: 11/27/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
10 - 5/8 inch X 3/4 inch -- 10 ESU's
1 - 5/8 inch X 3/4 inch -- I ESU's
= ESU's
0 - N/A = ESU's
Total #: 11 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 11 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 10 Domestic Meter(s) @ $23.21
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$23.21
Water Meter Deposit Fee (Domestic):
Total #: 10 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: I Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
10
@$450.00 ea.
$4,950.00
$550.00
$232.10
$23.21
$0.00
$0.00
$300.00
$35.00
$4,500.00
Wastewater Tap Inspection Fee:
Total #: 10 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 10 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$500.00
$500.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
10
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$12,850.00
N/A
$8,550.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$5,787.49
Page 2
RoADWAy IMPACT FEE CALCULATIoNs
PROJECT:
DATE:
The Estates of Cambridge Manor, Phase H
11/27/96
ROADWAY IMPACT FEE:
;ervice Area * 2
Residential
Category **
and Use **
Buildin~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
Single-Family Detached
N/A
10
2.85
$300
$8,550.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)