Loading...
Townhouses-LR000920 ,t REPORT OF FIELD /ik COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 1W Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 09/20/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-67B COPPELL,TEXAS • TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSTY MOISTURE DRY DENSITY COMPACTION COMMENT' PCF S PCF 1274 09/20/00 FG-6.3 4 20.1 101.9 21.7 102 100 1-A 1275' 09/20/00 FG-6.3 4 20.1 101.9 22.5 102 100 1-A 1276 09/20/00 FG-4.7 4 20.1 101.9 22.6 101 99 1-A 1277 09/20/00 FG-5.8 4 20.1 101.9 23.0 101 99 1-A 1278 09/20/00 FG-5.9 4 . 20.1 - 101.9 21.1 101 99 1-A 1279 . 09/20/00 FG-6.1 4 20.1 101.9 22.6 101 100 1-A 1280 • 09/20/00 FG-5.1 4 20.1 . 101.9 20.7 101 99 1-A TEST LOCATION: 1274 BLOCK A, PAD#35 1275 BLOCK A, PAD#36 • 1276 BLOCK A, PAD#38 1277 BLOCK A, PAD#39 1278. BLOCK A, PAD#40 1279 BLOCK A, PAD#41 1280 BLOCK A, PAD#43 CC: . STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS i IN S itted 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST ALP, TI'G,I C. Geotechnical Engineering N Construction Materials Testing /.Environmental Engineering I Con lti g REPORT OF FIELD IINL COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 1W Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 09/20/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-67A COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1267 09/20/00 FG-6.2 4 20.1 101.9 20.5 102 100 1-A 1268 09/20/00 FG-6.2 4 20.1 101.9 20.8 101 99 1-A 1269 09/20/00 FG-6.3 4 20.1 101.9 20.5 102 100 1-A 1270 09/20/00 FG-6.3 4 20.1 101.9 21.7 102 100 1-A 1271 09/20/00 FG-6.3 4 20.1 101.9 22.2 101 99 1-A 1272 09/20/00 FG-6.3 4 20.1 101.9 22.4 100 98 1-A 1273 09/20/00 FG-6.2 4 20.1 101.9 22.9 101 99 1-A TEST LOCATION: 1267 BLOCK A, PAD#27 1268 BLOCK A, PAD#28 1269 BLOCK A, PAD#29 1270 BLOCK A, PAD no 1271 BLOCK A, PAD#32 1272 BLOCK A, PAD#33 1273 BLOCK A, PAD#34 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS // 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS - Su,• ;tied 3. UME STABIL� WITH D C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY TH SPECIFICATIONS ,O. 4. CEMENT TREATED D. RETEST P, • i- I ,IN . Geotechnical Engineering 1 Construction Materials Testing I Environmental Engineering I Con Mi REPORT OF FIELD Nik COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 1W Dolts Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 09/20/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-67 COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID oPnMuM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1260 09/20/00 FG-4.8 4 20.1 101.9 20.1 101 99 1-A 1261 09/20/00 FG-5.0 4 20.1 101.9 21.0 100 98 1-A 1262 0920/00 FG-5.2 4 20.1 101.9 22.0 101 99 1-A 1263 09/20/00 FG-5.3 4 20.1 101.9 21.3 101 100 1-A 1264 09/20/00 FG-5.5 4 20.1 101.9 20.6 101 99 1-A 1265 09/20/00 FG-5.5 4 20.1 101.9 20.2 103 101 1-A 1266 09/20/00 FG-5.5 4 20.1 101.9 22.5 _ 101 99 1-A TEST LOCATION: 1260 BLOCK B,PAD#17 1261 BLOCK B,PAD#18 1262 BLOCK B, PAD#19 1263 BLOCK B,PAD#20 1264 BLOCK B,PAD#21 1265 BLOCK B, PAD#22 1266 BLOCK B,PAD#23 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS i / / 2. NATURAL SUBORADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS S �' Itttll� 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS /// 4. CEMENTTREATED D. RETEST ALP` G,I • Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Cons-Iii REPORT OF FIELD NL COMPACTION TESTS ALPHA TESTING, INC. 2209 Wlsconsln St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 09/20/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-64A COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF • 1211 09/20/00 FG-5.2 4 20.1 101.9 21.5 101 99 1-A 1212 09/20/00 FG-5.2 4 20.1 101.9 21.0 101 99 1-A 1213 09/20/00 FG-5.2 4 20.1 101.9 24.0 98 97 1-A 1214 09/20/00 FG-5.2 4 20.1 101.9 22.2 101 99 1-A 1215 09/20/00 FG-5.2 4 20.1 101.9 20.8 102 100 1-A 1216 09/20/00 FG-5.2 4 20.1 101.9 23.5 99 98 1-A 1217 09/20/00 FG-5.4 4 20.1 101.9 20.6 102 100 1-A TEST LOCATION: 1211 BLOCK A, PAD#45 1212 BLOCK A, PAD#46 1213 BLOCK A, PAD#47 1214 BLOCK A, PAD#48 1215 BLOCK A, PAD#49 1216 BLOCK A, PAD#50 1217 BLOCK A, PAD#51 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS - i 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS SU•, 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST I ,INC Geotechnical Engineering I Construction Materials Testing N Environmental Engineering I Con• Ili REPORT OF FIELD / ,. COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 09/20/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-64 COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF p 1204 09/20/00 FG-5.0 4 20.1 101.9 21.1 101 100 1-A - 1205 09/20/00 FG-5.0 4 20.1 101.9 21.9 101 99 1-A 1206 09/20/00 FG-4.3 4 20.1 101.9 21.3 102 100 1-A 1207 09/20/00 FG-4.3 4 20.1 101.9 23.4 • 98 96 1-A 1208 09/20/00 FG-3.8 4 20.1 101.9 21.9 101 99 1-A 1209 09/20/00 FG-3.8 4 20.1 101.9 21.4 101 99 1-A 1210 09/20/00 FG-5.3 4 20.1 101.9 22.9 100 98 1-A TEST LOCATION: 1204 PAVING LIBERTY CIRCLE AT STATION#1+00 1205 PAVING LIBERTY CIRCLE AT STATION#3+00 1206 PAVING LIBERTY CIRCLE AT STATION#0+75 1207 PAVING LIBERTY CIRCLE AT STATION#2+90 1208 PAVING LIBERTY CIRCLE AT STATION#1+05 1209 PAVING LIBERTY CIRCLE AT STATION#3+00 1210 BLOCK A,PAD#44 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Dy S 8d 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ir / 4. CEMENT TREATED D. RETEST •L" • G,I r r . / Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Con-ult •