Loading...
Townhouses-LR001004 REPORT OF FIELD Nk COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 1W Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 10/04/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-78B COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 1 1505 10/04/00 FG-2.5 2 - 19.0 100.4 19.7 _ 97 _ 97 1-A 1506 10/04/00 FG-2.5 2 19.0 100.4 19.8 98 98 1-A 1507 10/04/00 FG-2.5 2 19.0 100.4 19.8 96 96 . 1-A 1508 10/04/00 FG-2.2 2 19.0 100.4 20.0 99 98 1-A 1509 10/04/00 FG-2.2 2 19.0 100.4 19.4 99 99 1-A 1510. 10/04/00 FG-1.3 2 19.0 100.4 .. 20.2 99 98 1-A 1511 10/04/00 FG-1.5 2 19.0 100.4 19.1 97 97 1-A TEST LOCATION: 1505 BLOCK B, PAD#21 1506 BLOCK B, PAD#22 1507 BLOCK B, PAD#23 1508 BLOCK B, PAD#24 1509 BLOCK B, PAD#25 1510 BLOCK B, PAD#17 1511 BLOCK B, PAD#18 CC: STEVE TOPLETZ,ANDANTE 1. FILL . * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE 8. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS / / IKEd 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST / A'-' S G,I ,'. Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Co .ult. g REPORT OF FIELD '/Nhk COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 i TESTED FOR LEMP DEVELOPMENT DATE 10/04/00 • DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-78A COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 1498 10/04/00 FG-1.4 2 19.0 100.4 19.6 97 97 1-A 1499 10/04/00 FG-3.1 2 19.0 100.4 21.0 96 96 1-A 1500 10/04/00 FG-2.6 2 19.0 100.4 19.8 97 96 1-A 1501 10/04/00 FG-1.8 2 19.0 100.4 21.1 98 97 1-A 1502 • 10/04/00 FG-2.0 2 19.0 100.4 19.1 97 97 1-A 1503 10/04/00 FG-2.2 2 19.0 100.4 20.8 97 97 • 1-A 1504 10/04/00 FG-2.3 4 20.1 101.9 21.6 100 98 1-A TEST LOCATION: 1498 BLOCK A, PAD#52 1499 BLOCK A, PAD#54 i I 1500 BLOCK A, PAD#54 1501: BLOCK B, PAD#17 1502 BLOCK B, PAD#18 1503 BLOCK B, PAD#19 1504 BLOCK B, PAD#20 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS - / 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS INS ed 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS /� " LP AT 4.CEMENT TREATED D. RETEST / I , • . Geotechnical Engineering I Construction Materials Testing •Environmental Engineering I Cons tin REPORT OF FIELD NL. COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 1W Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 i TESTED FOR. LEMP DEVELOPMENT DATE 10/04/00 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-78 COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1491 10/04/00 FG-1.7 4 20.1 101.9 20.1 97 95 1-A 1492 .10/04/00 FG-1.8 4 20.1 101.9 20.4 97 96 1-A 1493 10/04/00 FG-1.9 2 19.0 100.4 19.0 98 98 1-A 1494 10/04/00 FG-2.3 2 19.0 100.4 20.0 99 98 1-A 1495 10/04/00 FG-2.3 2 19.0 100.4 19.1 96 96 1-A 1496 10/04/00 FG-2.1 2 19.0 100.4 19.7 96 95 1-A 1497 10/04/00 FG-1.4 2 19.0 100.4 21.0 96 96 1-A TEST LOCATION: 1491 BLOCK A, PAD#23 1492 BLOCK A, PAD#24 1493 BLOCK A, PAD#25 1494 BLOCK A, PAD#35 1495 BLOCK A, PAD#36 1496 BLOCK A, PAD#41 1497 BLOCK A, PAD#51 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS / / 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS -, y Iy S% �ei 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST A? • E" it L, NC Geotechnical Engineering / Construction Materials Testing /Environmental Engineering Con u/ti •