Loading...
Townhouses-LR010206 REPORT OF FIELD /%- COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 700 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/06/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-86A COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRYDENSITY MOISTURE DRYDENSITY COMPACTION COMMENT' PCF % PCF 1610 02/06/01 FG-10.0 2 19.0 100.4 22.0 100 100 1-A 1611 02/06/01 FG-10.0 2 19.0 100.4 22.2 101 101 1-A 1612 02/06/01 FG-9.0 2 19.0 100.4 23.3 99 98 1-A TEST LOCATION: 1610 SANITARY SEWER LINE D AT STATION#1+00 1611 SANITARY SEWER LINE D AT STATION#3+00 1612 SANITARY SEWER LINE D AT STATION#0+50 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS pe ully S Itted 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D. RETEST ALP TI G,IN . Geotechnica1 Engineering f Construction Materials Testing /Environmental Engineering N Con u/f• g REPORT OF FIELD /k COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/06/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-86 COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1603 02/06/01 FG-13.0 2 19.0 100.4 20.3 100 100 1-AD 1604 02/06/01 FG-13.0 2 19.0 100.4 21.6 100 99 1-AD 1605 02/06/01 FG-13.0 2 19.0 100.4 20.7 101 100 1-AD 1606 02/06/01 FG-12.0 4 20.1 101.9 20.5 103 101 1-A 1607 02/06/01 FG-12.0 2 19.0 100.4 20.4 100 100 1-A 1608 02/06/01 FG-11.0 4 20.1 101.9 21.1 102 100 1-A 1609 _ 02/06/01 FG-11.0 2 19.0 _ 100.4 22.6 100 100 1-A TEST LOCATION: 1603 RETEST OF TEST#1600 PERFORMED ON 2/6/01 1604 RETEST OF TEST#1601 PERFORMED ON 2/6/01 1605 RETEST OF TEST#1602 PERFORMED ON 2/6/01 1606 SANITARY SEWER LINE D AT STATION#0+75 1607 SANITARY SEWER LINE D AT STATION#3+00 1608 SANITARY SEWER LINE D AT STATION#1+00 1609 SANITARY SEWER LINE D AT STATION#2+80 CC: STEVE TOPLETZ, ANDANTE 1 FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS / 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS - .ec ,Ily S ,, ed 3. LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D. RETEST ALP ING,INC Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Consulti g REI JRT OF FIELD /%, COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/06/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-85 COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1600 02/06/01 FG-13.0 2 19.0 100.4 15.9 101 100 1-C 1601 02/06/01 FG-13.0 2 19.0 100.4 17.5 100 100 1-C 1602 02/06/01 FG-13.0 2 19.0 100.4 15.6 101 101 1-C TEST LOCATION: 1600 SANITARY SEWER LINE D AT STATION#0+50 1601 SANITARY SEWER LINE D AT STATION#1+50 1602 SANITARY SEWER LINE D AT STATION#3+00 CC: STEVE TOPLETZ,ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS / // 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS -�..ec ,, ,,mi 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS _ 4 CEMENT TREATED D. RETEST ALP'A S G,I Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Con- It g