Loading...
Townhouses-LR010214 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-97B COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' PCF % PCF 1750 02/14/01 FG-1.0 3 21.6 98.8 23.7 94 95 1-A 1751 02/14/01 FG-1.0 3 21.6 98.8 21.6 96 98 1-A TEST LOCATION: 1750 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#57 1751 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#58 CC: STEVE TOPLETZ,ANDANTE 1 FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS i / 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R p C Ily Sub ted 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D. RETEST PH S N IN . Geotechnical Engineering / Construction Materials Testing /Environmental Engineering Consultin REPORT OF FIELD N%- COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-97A COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1743 02/14/01 FG-3.0 3 21.6 98.8 22.6 95 96 1-A 1744 02/14/01 FG-2.0 3 21.6 98.8 23.0 94 95 1-A 1745 02/14/01 FG-2.0 3 21.6 98.8 22.3 95 96 1-A 1746 02/14/01 FG-2.0 3 21.6 98.8 21.8 96 98 1-A 1747 02/14/01 FG-2.0 3 21.6 98.8 24.1 95 96 1-A 1748 02/14/01 FG-1.0 3 21.6 98.8 23.4 95 96 1-A 1749 02/14/01 FG-1.0 3 21.6 98.8 21.6 96 97 1-A TEST LOCATION: 1743 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#58 1744 SANITARY SEWER LATTERAL, 20' NORTH & 8' EAST FROM THE NORTHWEST CORNER OF BUILDING#55 1745 SANITARY SEWER LATTERAL, 25' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#56 1746 SANITARY SEWER LATTERAL, 25' NORTH & 8' EAST FROM THE NORTHWEST CORNER OF BUILDING#57 1747 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#58 1748 SANITARY SEWER LATTERAL, 20' NORTH & 8' EAST FROM THE NORTHWEST CORNER OF BUILDING#55 1749 SANITARY SEWER LATTERAL, 25' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#56 CC: STEVE TOPLETZ, ANDANTE , � 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS I/ 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Re citf ly Sub . 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS �i�' 4 CEMENT TREATED D. RETEST ALPH S G{IN . - Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Consulti / `; REPORT OF FIELD /i,, COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 1 I TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-97 COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF ■ 1736 02/14/01 FG-4.0 3 21.6 98.8 22.5 94 95 1-A 1737 02/14/01 FG-4.0 3 21.6 98.8 21.6 94 95 1-A 1738 02/14/01 FG-4.0 3 21.6 98.8 21.6 96 97 1-A 1739 02/14/01 FG-4.0 3 21.6 98.8 21.6 96 97 1-A 1740 02/14/01 FG-3.0 3 21.6 98.8 21.6 96 97 1-A 1741 02/14/01 FG-3.0 3 21.6 98.8 22.4 96 97 1-A 1742 02/14/01 FG-3.0 3 21.6 98.8 22.0 93 95 1-A TEST LOCATION: 1736 SANITARY SEWER LATTERAL, 20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#55 1737 SANITARY SEWER LATTERAL, 25' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#56 1738 SANITARY SEWER LATTERAL,25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#57 1739 SANITARY SEWER LATTERAL,20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#58 1740 SANITARY SEWER LATTERAL, 20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#55 1741 SANITARY SEWER LATTERAL, 25' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#56 1742 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#57 CC: STEVE TOPLETZ, ANDANTE r 1 Fn_� * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 Ni.TURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Re..ectf, • • _l / 3 _TIE STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS �/// a CEMENT TREATED D RETEST ALP r T; I ,S, INC. Geotechnical Engineering 1 Construction Materials Testing /Environmental Engineering /Cons tin. REPORT OF FIELD Nk COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-96B COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF ■ 1730 02/14/01 FG-2.0 3 21.6 98.8 21.6 96 97 1-A 1731 02/14/01 FG-2.0 3 21.6 98.8 21.6 96 97 1-A 1732 02/14/01 FG-1.0 3 21.6 98.8 22.8 95 96 1-A 1733 02/14/01 FG-1.0 3 21.6 98.8 23.0 95 96 1-A 1734 02/14/01 FG-1.0 3 21.6 98.8 22.7 94 95 1-A 1735 02/14/01 FG-1.0 3 21.6 98.8 22.9 95 96 1-A TEST LOCATION: 1730 SANITARY SEWER LATTERAL, 20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#52 1731 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#54 1732 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#50 1733 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#51 1734 SANITARY SEWER LATTERAL,20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#52 1735 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#54 CC: STEVE TOPLETZ, ANDANTE / 1 FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS lec,2 NF,TURA L SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS . ly S •' i ed 3 _IIAE STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 DEMENT TREATED D RETEST 'LP,. TING, INC. Geotechnical Engineering 1 Construction Materials Testing 1 Environmental Engineering 1 Con• Itin. REPORT OF FIELD /N COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-96A COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' PCF % PCF 1723 02/14/01 FG-4.0 3 21.6 98.8 21.6 96 97 1-A 1724 02/14/01 FG-3.0 3 21.6 98.8 22.7 95 96 1-A 1725 02/14/01 FG-3.0 3 21.6 98.8 21.7 96 97 1-A 1726 02/14/01 FG-3.0 3 21.6 98.8 22.8 95 96 1-A 1727 02/14/01 FG-3.0 3 21.6 98.8 23.0 95 96 1-A 1728 02/14/01 FG-2.0 3 21.6 98.8 24.0 94 95 1-A 1729 02/14/01 FG-2.0 3 21.6 98.8 23.1 94 95 1-A TEST LOCATION: 1723 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#54 1724 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#50 1725 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#51 1726 SANITARY SEWER LATTERAL, 20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#52 1727 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#54 1728 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING #50 1729 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#51 CC: STEVE TOPLETZ, ANDANTE G - * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS / 2 \..TU.RAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Re•.•ctfu.•• Sub .t: LIE STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RETEST ALP • DIG, INC. Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Cons ting ./ Y REPORT OF FIELD ///. COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/14/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-96 COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* PCF % PCF 1716 02/14/01 FG-5.0 3 21.6 98.8 21.7 95 96 1-A 1717 02/14/01 FG-5.0 3 21.6 98.8 21.5 94 95 1-A 1718 02/14/01 FG-4.0 3 21.6 98.8 21.9 94 95 1-A 1719 02/14/01 FG-4.0 3 21.6 98.8 21.5 94 95 1-A 1720 02/14/01 FG-4.0 3 21.6 98.8 21.9 95 96 1-A 1721 02/14/01 FG-4.0 3 21.6 98.8 23.5 95 96 1-A 1722 02/14/01 FG-4.0 3 21.6 98.8 22.3 95 96 1-A TEST LOCATION: 1716 SANITARY SEWER LINE F AT STATION#3+95 1717 SANITARY SEWER LINE F AT STATION #4+95 1718 SANITARY SEWER LINE F AT STATION #3+75 1719 SANITARY SEWER LINE F AT STATION #5+25 1720 SANITARY SEWER LATTERAL, 25' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#50 1721 SANITARY SEWER LATTERAL, 20' NORTH & 16' EAST FROM THE NORTHWEST CORNER OF BUILDING#51 1722 SANITARY SEWER LATTERAL, 20' NORTH &8' EAST FROM THE NORTHWEST CORNER OF BUILDING#52 CC: STEVE TOPLETZ, ANDANTE 1 RI * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 Nf.TURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R%!-ctfu Sub 'Ittti 3 _d.IE STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS . 4 CEMENT TREATED D. RETEST ALP G, INC. Geotechnical Engineering N Construction Materials Testing I Environmental Engineering I Cons/. 1