Loading...
Townhouses-LR010219 REPORT OF FIELD /i.- COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/19/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-101A COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* PCF % PCF 1783 02/19/01 FG-1.0 2 19.0 100.4 21.3 97 97 1-A \' ?-1 \ kk0 19j .IS cjo1 C TEST LOCATION: 1783 35' SOUTH AND 3' EAST FROM SOUTHEAST CORNER OF MANHOLE ON LINE B AT STATION#3+93 CC: STEVE TOPLETZ, ANDANTE I 1 FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS /� / 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R pe• uIIy� mitt. 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS � 4 CEMENT TREATED D. RETEST ALF TIES IN Geotechnical Engineering I Construction Materials Testing N Environmental Engineering Conguu/lltti.ig REPORT OF FIELD 1ik- COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/19/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-101 COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 1776 02/19/01 FG-4.5 2 19.0 100.4 21.8 98 98 1-A 1777 02/19/01 FG-3.5 2 19.0 A 100.4 22.5 98 97 1-A 1778 02/19/01 FG-2.5 2 19.0 100.4 21.0 99 99 1-A 1779 02/19/01 FG 2 19.0 100.4 21.4 99 98 1-A 1780 02/19/01 FG-4.0 2 19.0 100.4 20.5 100 100 1-A 1781 02/19/01 FG-3.0 2 19.0 100.4 21.8 97 97 1-A 1782 _ 02/19/01 FG-2.0 2 19.0 100.4 21.9 98 98 1-A TEST LOCATION: 1776 8" SANITARY SEWER LINE C AT STATION#0+60 1777 8" SANITARY SEWER LINE CAT STATION#0+20 1778 8" SANITARY SEWER LINE C AT STATION#0+70 1779 8"SANITARY SEWER LINE C AT STATION#0+30 1780 35'WEST AND 3' SOUTH FROM NORTHWEST CORNER OF MANHOLE ON LINE B AT STATION#3+93 1781 35' EAST AND 3' SOUTH FROM NORTHWEST CORNER OF MANHOLE ON LINE B AT STATION#3+93 1782 _35' SOUTH AND 3' WEST FROM SOUTHWEST CORNER OF MANHOLE ON LINE B AT STATION#3+93 CC: STEVE TOPLETZ,ANDANTE , / i /1. FILL A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS / 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS pe tfuIIy ,l] Itted .' 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS i" _ 4 CEMENT TREATED D. RETEST Construction A 7 TES NG, IN ./ Geotecnnicai Engineering i Construction Materials Testing /Environmental Engineering /CoOsulNng / REPORT OF FIELD N COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/19/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-100C COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* PCF % PCF 1773 02/19/01 FG-1.0 2 19.0 100.4 19.5 101 100 1-A 1774 02/19/01 FG-1.0 2 19.0 100.4 21.0 98 98 1-A 1775 02/19/01 FG-1.0 2 19.0 100.4 21.5 98 98 1-A TEST LOCATION: 1773 SANITARY SEWER LATTERAL, 25' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#4 1774 SANITARY SEWER LATTERAL, 20' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#3 1775 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#2 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R ectf.1 1 y Sub ed 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS � 4 CEMENT TREATED D. RETEST ALPH• N , IN N Geotechnical Engineering / Construction Materials Testing Environmental Engineering Consultinv REPORT OF FIELD /k COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/19/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-100B COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 1766 02/19/01 FG-2.0 2 19.0 100.4 22.5 97 97 1-A 1767 02/19/01 FG-2.0 2 19.0 100.4 20.3 98 98 1-A 1768 02/19/01 FG-2.0 2 19.0 100.4 23.2 97 97 1-A 1769 02/19/01 FG-2.0 2 19.0 100.4 19.5 99 99 1-A 1770 02/19/01 FG-1.0 2 19.0 100.4 21.5 98 98 1-A 1771 02/19/01 FG-1.0 2 19.0 100.4 20.1 100 99 1-A 1772 02/19/01 FG-1.0 2 19.0 100.4 19.8 100 100 1-A TEST LOCATION: 1766 SANITARY SEWER LATTERAL, 25' SOUTH& 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#5 1767 SANITARY SEWER LATTERAL, 25' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#4 1768 SANITARY SEWER LATTERAL, 20' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#3 1769 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#2 1770 SANITARY SEWER LATTERAL, 20' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#7 1771 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#6 1772 SANITARY SEWER LATTERAL, 25' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#5 CC: STEVE TOPLETZ,ANDANTE / 1 FILL • A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R ctf y$ub d / 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS \� _ 4 CEMENT TREATED D RETEST H% '•,.T G, INC. Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Consulti . I / I REPORT OF FIELD 1/ COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 02/19/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-100A COPPELL, TEXAS TEST DATA: TEST ELEV• SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 1759 02/19/01 FG-3.0 2 19.0 100.4 23.0 99 98 1-A 1760 02/19/01 FG-3.0 2 19.0 100.4 21.1 101 100 1-A 1761 02/19/01 FG-3.0 2 19.0 100.4 21.9 99 98 1-A 1762 02/19/01 FG-3.0 2 19.0 100.4 20.7 100 100 1-A 1763 02/19/01 FG-3.0 2 19.0 100.4 20.5 99 99 1-A 1764 02/19/01 FG-2.0 2 19.0 100.4 20.7 101 101 1-A 1765 02/19/01 FG-2.0 2 19.0 100.4 22.0 97 96 1-A TEST LOCATION: . 1759 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#6 1760 SANITARY SEWER LATTERAL, 25' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#5 1761 SANITARY SEWER LATTERAL, 25' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#4 1762 SANITARY SEWER LATTERAL, 20' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#3 1763 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#2 1764 SANITARY SEWER LATTERAL, 20' SOUTH & 8'WEST FROM THE SOUTHEAST CORNER OF BUILDING#7 1765 SANITARY SEWER LATTERAL, 20' SOUTH & 16'WEST FROM THE SOUTHEAST CORNER OF BUILDING#6 CC: STEVE TOPLETZ, ANDANTE 1 FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R c Ily Su, ltted 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS /' 4 CEMENT TREATED D. RETEST ALP r T I N . Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Consult g f