Cambridge Phase 2-CS 961118ALL RESIDENTS of THE ESTATES OF CAMBRIDGE MANOR ~
Per my telephone conversation, this date, with Mr. Ken Griffin,
City of Coppell Engineer/Assistant City Manager, the following
is hereby submitted for your information:
DALLAS COUNTy HIGHWAy & ROAD CREWS WILL
BEGIN WIDENING DEFOREST ROAD ON OR ABOUT
MONDAy, SEPTEMBER 9th, 1996. THE PRO-
JECTED CONSTRUCTION TIME IS APPROXIMATELy
FIVE (5) WORKING DAYS, HOWEVER, BASED ON
PAST EXPERIENCES PERTAINING TO ANy TyPE
OF CONSTRUCTION, IT WILL MORE THAN LIKELy
TAKE TEN (10) TO FIFTEEN (15) DAyS TO
COMPLETE. DEFOREST ROAD WILL BE WIDENED
FROM ITS PRESENT FOURTEEN FEET (14') TO
BETWEEN EIGHTEEN (18) AND TWENTy (20)
FEET. AFTER DALLAS COUNTy COMPLETES
THIS TASK, THE CITy OF COPPELL WILL MAKE
A DETERMINATION ON WHETHER TO HAVE A
CENTER LINE AND/OR STRIPING PAINTED DOWN
THE CENTER OF THE "NEW" DEFOREST ROAD.
THE PLANS DURING CONSTRUCTION WILL BE TO
HAVE DEFOREST ROAD OPEN TO TRAFFIC, BUT
UTILIZING ONLy ONE-LANE. THE ACTUAL
WIDENING OF DEFOREST ROAD WILL COMMENCE
WEST FROM MACARTHUR BOULEVARD AND CONTINUE
EAST TO ALLEN ROAD ONLy.
In closing, although this will create a temporary inconvenience
to all of our residents, we feel that it will ultimately be
safer for all vehicles as well as pedestrians traveling Deforest
Road.
If you have any questions, whatsoever, regarding any item or
items in this letter, please feel free to contact me anytime
~ 214/ 908-1068. "
Sincerely,