Loading...
Townhouses-LR010426 REPORT OF FIELD \ COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 04/26/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-124 COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' PCF % PCF 1998 04/26/01 FG-0.7 2 19.0 100.4 21.3 97 97 1-A 1999 04/26/01 FG-0.8 2 19.0 100.4 21.9 99 98 1-A 2000 04/26/01 FG-0.3 2 19.0 100.4 22.1 100 99 1-A 2001 04/26/01 FG-0.9 2 19.0 100.4 21.6 98 97 1-A • 2002 04/26/01 FG-0.4 2 19.0 100.4 21.0 97 97 1-A 2003 04/26/01 FG-0.6 2 19.0 100.4 23.8 98 97 1-A 2004 04/26/01 FG-0.6 4 20.1 101.9 21.5 101 99 1-A TEST LOCATION: 1998 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 38 1999 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 39 2000 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 39 2001 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 40 2002 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 40 2003 12' N AND 50' E FROM SW CORNER OF BLOCK A, PAD 41 2004 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 43 CC: STEVE TOPLETZ, ANDANTE 1. FILL •A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS .'es.-, ully S ilet' ed 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST / AL•,�pt • ING,INC. Our test results&reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or dist .uted e ept w' express appr. al of ALPHA. The use of our name&test results must receive our written approval. Test results&reports apply only to the samples tested and/or observed,and are not indicative of the qualiti• of apparently identical or similar specimens. Geotechnical Engineering / Construction Materials Testing /Environmental Engineering/Consulting REPORT OF FIELD Nik COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 04/26/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-124A COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' PCF % PCF 2005 04/26/01 FG-0.8 2 19.0 100.4 22.4 98 97 1-A 2006 04/26/01 FG-0.3 2 19.0 100.4 22.1 100 99 1-A 2007 04/26/01 FG-0.7 2 19.0 100.4 21.3 101 100 1-A 2008 04/26/01 FG-0.7 1 22.5 99.5 24.2 98 98 1-A 2009 04/26/01 FG-0.7 1 22.5 99.5 25.7 95 95 1-A 2010 04/26/01 FG-0.7 1 22.5 99.5 25.8 97 97 1-A 2011 04/26/01 FG-0.4 1 22.5 99.5 26.4 94 95 1-A TEST LOCATION: BUILDING PAD 2005 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 44 2006 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 44 2007 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 45 2008 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 47 2009 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 48 2010 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 50 2011 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 51 CC: STEVE TOPLETZ, ANDANTE 1. FILL 'A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ,- i pe..'Ily Su ed 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST - P , S G,INC. Our test results&reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distri• ted exc'.t wit express appr al of ALPHA. The use of our name&test results must receive our written approval. Test results&reports apply only to the samples tested and/or observed,and are not indicative of the q .litie-of apparently identical or similar specimens. Geotechnical Engineering 1 Construction Materials Testing /Environmental Engineering /Consulting REPORT OF FIELD lk COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DATE 04/26/01 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-124B COPPELL,TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 2012 04/26/01 FG-0.9 1 22.5 99.5 24.6 98 98 1-A 2013 04/26/01 FG-0.4 1 22.5 99.5 25.3 97 97 1-A 2014 04/26/01 FG-0.6 1 22.5 99.5 25.6 96 96 1-A 2015 04/26/01 FG-0.6 1 22.5 99.5 24.9 98 98 1-A 2016 04/26/01 FG-0.6 1 22.5 99.5 22.8 99 99 1-A 2017 04/26/01 FG-0.7 1 22.5 99.5 24.6 96 96 1-A 2018 04/26/01 FG-0.3 1 22.5 99.5 24.2 98 98 1-A TEST LOCATION: BUILDING PAD 2012 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 52 2013 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 52 2014 50' N AND 12'W FROM SE CORNER OF BLOCK A, PAD 54 2015 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 9 2016 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 10 2017 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 11 2018 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 12 CC: STEVE TOPLETZ, ANDANTE ) 1. FILL •A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS j- p ully S , 'tted 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST ALP, ' ING,INC. Our test results&reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distri' ted ex 'pt wi express appro of ALPHA. The use of our name&test results must receive our written approval. Test results&reports apply only to the samples tested and/or observed,and are not indicative of the q■alitie•of apparently id: tical or similar specimens. Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I Consulting REPORT OF FIELD Nk COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.,Suite 100 Dallas,Texas 75229 972/620-8911 - 972/263-4937(Metro) FAX: 972/406-8023 I TESTED FOR LEMP DEVELOPMENT DATE 04/26/01 DALLAS,TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-124C COPPELL, TEXAS TEST DATA: TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 2019 04/26/01 FG-0.4 2 19.0 100.4 21.7 100 100 1-A 2020 04/26/01 FG-0.7 1 22.5 99.5 23.5 100 100 1-A 2021 04/26/01 FG-0.3 1 22.5 99.5 23.0 99 100 1-A 2022 04/26/01 FG-0.3 1 22.5 99.5 25.1 96 97 1-A 2023 04/26/01 FG-0.8 1 22.5 99.5 26.0 95 95 1-A 2024 04/26/01 FG-0.3 1 22.5 99.5 23.5 97 97 1-A 2025 04/26/01 FG-0.5 1 22.5 99.5 23.1 97 97 1-A TEST LOCATION: BUILDING PAD 2019 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 13 2020 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 14 2021 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 15 2022 50' S AND 12' E FROM NW CORNER OF BLOCK B, PAD 16 2023 12' S AND 50'W FROM NE CORNER OF BLOCK B, PAD 17 2024 12' S AND 50'W FROM NE CORNER OF BLOCK B, PAD 17 2025 12' S AND 50' W FROM NE CORNER OF BLOCK B, PAD 18 CC: STEVE TOPLETZ, ANDANTE 1. FILL •A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 7.-spe'fully Su ed 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST •LP, • N ,INC. Our test results&reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distri. ted exc:.t wit express approv I of ALPHA. The use of our name&test results must receive our written approval. Test results&reports apply only to the samples tested and/or observed,and are not indicative of the q =litie of apparently ide ical or similar specimens. Geotechnical Engineering / Construction Materials Testing 1 Environmental Engineering N Consulting