Loading...
North Texas Mail-LR 880331 Maxim Engineers, Inc. iG_eo[eChhiCal .~_Mate/ials -Jesting 2342 Fabens P.O. Box 59902 Dallas, Texas 75229 (214) 247-7575 In-Place Density of Soil Flelx~tDlte To Ma~l o3/33./88 ~ D.,o o3/3o/81 ~ T~Ie ~ U.S. Po~t Office Pipe T,'~te l~.~OC~i, Yellowish brown silty sandy clay with occasional ~vk brown and olive hz-own clay Density Test Methods: Ag]~ D2922 and D3017 Maximum I (Lbs.~ 92. I Method of Compaction: Test Material Dry No. No. LIFt Location D~.W I Lbs./Cu. Ft 22 1st Pipe lille ditch, 1st lift 23 .... ~ 25 2r~ Pipe line ditch, 1st lift 2640+00' Pipe line ditch, and lift after concrete slab, static~ 2645+05 2645+10 92.4 87.5 91.3 90.2 Techrtician: G. McCOy /~n )nj Density Oplimum Moisture ;u.R.} (Percent) ~ D698 27.1 Moisture Content Percent (%) of I (%) I Maximum I:)W Denaty 29.5 100.4 26.8 95.1 25.3 99.2 E;4~lorer Pipe Line Cc~pany - ~ .4z~derson 28.4 98.0 Maxim Engineers, Inc. Reviewed by: