Loading...
ST0501-LR121030 (2) OCT-31-2012 01 :39 P.24 A Texas • CMT, Inc. !-A Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT ❑ CANCELLATION ■ STAND-BY Report Date: October 30,2012 Test Date: October 27,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 13 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results • • Scheduled Concrete Arrival Time: 9:30 AM Type of Service Scheduled: Utility Patch Concrete Testing for Tiseo Paving Time Arrived at Job: 9:45 AM • Time Concrete Arrived at Job: 10:30 AM Total Charged Time: 0.75 flours Reason: Tiseo not ready. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot- Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot@BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the furl approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products, OCT-31-2012 01:39 P.25 Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT ❑ CANCELLATION ■ STAND-BY Report Date: October 30,2012 Test Date: October 29,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. . 14 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Time: 9:45 AM Type of Service Scheduled: Driveway Concrete Testing for . California Construction Sidewalk Observation and Testing Completed at:- 9:45 AM Time Concrete Arrived for Driveway • 10:30 AM Total Charged Time: 0.75 Hours Reason: Waiting on driveway concrete delivery. Technician: RG cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall- City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot-Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill- Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Bobby Bounds -California Construction, Phone: 972-670-0368; via E-mail: Bobby@CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: • All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.25 OCT-31-2012 01:39 P.23 Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT ❑ CANCELLATION • STAND-BY Report Date: October 30, 2012 Test Date: October 23, 2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 12 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Concrete Arrival Time: 12:00 PM Type of Service Scheduled: Concrete Testing of Integral Wall and Driveway . Approach for California Construction . Time Arrived at Job: 12:00 PM • Time Concrete Arrived at Job: 1:45 PM Total Charged Time: 1.75 Hours Reason: Waited for concrete delivery by Redi-Mix Concrete. Initially told concrete would be one-half (%2) hour late. Then multiple fifteen (15) minute delivery delays took place. Technician: RG cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot-Burgess &Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com • Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 0.2-'41; All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. OCT-31-2012 01:39 P.21 AVA C Texas CMT, Inc. Construction Materials Testing GEE o Inc. 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • GENERAL REPORT 0 CANCELLATION • STAND-BY Report Date: October 30,2012 Test Date: October 16,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 10 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Concrete Arrival Time: 1:30 PM Type of Service Scheduled: Concrete Testing of Integral Wall for California . Construction Time Arrived at Job: 1:30 PM • Time Concrete Arrived at Job: 2:39 PM Total Charged Time: 1.0 Hours Reason: Waited for concrete delivery by Redi-Mix Concrete. Technician: MR cc: Mr. Larry Davis - City of Coppeil, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr. Dan DeGroot -Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: r All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. OCT-31-2012 01:39 P.22 Texas CMT Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT ❑ CANCELLATION • STAND-BY Report Date: October 30,2012 Test Date: October 17,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 11 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Concrete Arrival Time: 2:00 PM Type of Service Scheduled: Inlet Concrete Testing for Texas Inlets Time Arrived at Job: 12:00 PM Time Left Job: 2:33 PM Total Charged Time: 1.0 Hours • Reason: Performed testing for sidewalk concrete for California Construction until 1:30 PM. Thereafter, waited for inlet concrete delivery until 2:33 PM when a Texas Inlet crew member found out that the concrete delivery was to be delayed by another approximately 30 minutes. At this time Walter instructed to skip this particular inlet concrete and to leave site. Technician: MR cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall -City of Coppell, Phone: 972-304-3562;via E-mail: gMarshall@coppelltx.gov Mr. Dan DeGroot-Burgess&Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.