ST0501-LR121030 (2) OCT-31-2012 01 :39 P.24
A Texas • CMT, Inc.
!-A
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
GENERAL REPORT ❑ CANCELLATION ■ STAND-BY
Report Date: October 30,2012 Test Date: October 27,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 13
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
•
• Scheduled Concrete Arrival Time: 9:30 AM
Type of Service Scheduled: Utility Patch Concrete Testing for Tiseo Paving
Time Arrived at Job: 9:45 AM
•
Time Concrete Arrived at Job: 10:30 AM
Total Charged Time: 0.75 flours
Reason: Tiseo not ready.
Technician: RG
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov
Mr. Dan DeGroot- Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot@BurgessNiple.com
Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com
Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the furl approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products,
OCT-31-2012 01:39 P.25
Texas CMT, Inc.
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
GENERAL REPORT ❑ CANCELLATION ■ STAND-BY
Report Date: October 30,2012 Test Date: October 29,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. . 14
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
Scheduled Time: 9:45 AM
Type of Service Scheduled: Driveway Concrete Testing for .
California Construction
Sidewalk Observation and Testing Completed at:- 9:45 AM
Time Concrete Arrived for Driveway • 10:30 AM
Total Charged Time: 0.75 Hours
Reason: Waiting on driveway concrete delivery.
Technician: RG
cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall- City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov
Mr. Dan DeGroot-Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com
Mr. Robert Caudill- Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com
Mr. Bobby Bounds -California Construction, Phone: 972-670-0368; via E-mail: Bobby@CalConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: •
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
TOTAL P.25
OCT-31-2012 01:39 P.23
Texas CMT, Inc.
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
GENERAL REPORT ❑ CANCELLATION • STAND-BY
Report Date: October 30, 2012 Test Date: October 23, 2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 12
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
Scheduled Concrete Arrival Time: 12:00 PM
Type of Service Scheduled: Concrete Testing of Integral Wall and Driveway .
Approach for California Construction .
Time Arrived at Job: 12:00 PM
•
Time Concrete Arrived at Job: 1:45 PM
Total Charged Time: 1.75 Hours
Reason: Waited for concrete delivery by Redi-Mix
Concrete. Initially told concrete would be one-half
(%2) hour late. Then multiple fifteen (15) minute
delivery delays took place.
Technician: RG
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov
Mr. Dan DeGroot-Burgess &Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com
Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com
Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com •
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 0.2-'41;
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
OCT-31-2012 01:39 P.21
AVA C
Texas CMT, Inc.
Construction Materials Testing
GEE o Inc.
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
•
GENERAL REPORT 0 CANCELLATION • STAND-BY
Report Date: October 30,2012 Test Date: October 16,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 10
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
Scheduled Concrete Arrival Time: 1:30 PM
Type of Service Scheduled: Concrete Testing of Integral Wall for California .
Construction
Time Arrived at Job: 1:30 PM
•
Time Concrete Arrived at Job: 2:39 PM
Total Charged Time: 1.0 Hours
Reason: Waited for concrete delivery by Redi-Mix
Concrete.
Technician: MR
cc: Mr. Larry Davis - City of Coppeil, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov
Mr. Dan DeGroot -Burgess&Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessNiple.com
Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill @TiseoPaving.com
Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: r
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
OCT-31-2012 01:39 P.22
Texas CMT Inc.
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
GENERAL REPORT ❑ CANCELLATION • STAND-BY
Report Date: October 30,2012 Test Date: October 17,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 11
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
Scheduled Concrete Arrival Time: 2:00 PM
Type of Service Scheduled: Inlet Concrete Testing for Texas Inlets
Time Arrived at Job: 12:00 PM
Time Left Job: 2:33 PM
Total Charged Time: 1.0 Hours
•
Reason: Performed testing for sidewalk concrete for
California Construction until 1:30 PM. Thereafter,
waited for inlet concrete delivery until 2:33 PM
when a Texas Inlet crew member found out that
the concrete delivery was to be delayed by
another approximately 30 minutes. At this time
Walter instructed to skip this particular inlet
concrete and to leave site.
Technician: MR
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall -City of Coppell, Phone: 972-304-3562;via E-mail: gMarshall@coppelltx.gov
Mr. Dan DeGroot-Burgess&Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com
Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com
Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.