Loading...
Coppell Ind 2-CS121011 (2) 1 : 1 HILLWOOD A PEROT COMPANY'; October 11, 2012 The City of Coppell Mr. Keith Marvin, P.E. Engineering Department 255 Parkway Blvd. Coppell,TX 75019 RE:Tradepoint II Storm Retention Design and Inspection Dear Mr. Marvin, At the request of the City, TRADEPOINT BLDG 2, LP. ("Hillwood") is providing this letter to acknowledge the following as it relates to the design and inspection associated with the site storm water detention; • The corrugated metal pipe (CMP)detention system submitted for permit is a proprietary system designed by Contech Engineered Solutions, LLC. By reviewing and approving the permit drawings,the City makes no representations regarding the functional suitability of the system design or its components. • As part of their jurisdictional responsibilities,the City will be performing a variety of inspection activities in and around the installation location of the CMP. The City inspections will not be performed for the purpose of verifying construction means and methods or the functional adequacy of the CMP installation. These type inspections will be the responsibility of Hillwood's consultants. We trust this letter will satisfy your request and we appreciate your assistance with the issuance of our permit. Please contact me if you need any additional information. Sincerely, TRADEPOINT BLDG 2, LP, a Texas limited partnership, its general partner By: Tradepoint GP, LLC, a Texas limited liability company, its general partner By: Printed Name: �-P PTZ`1) (2-4"6r7,1=4— Title: 't .-t l si Dcl∎I— CC Mr. Scott Norman 3090 Olive Street Suite 300 Dallas, TX 75219 214 303 5535 www.hillwood.com