Trinity Shores-CS010906 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Trinity Shores, Lots 1-19, Final Plat, to allow the platting of 19 single-family
lots and two common areas on approximately 7.31 acres of property located
along the south side of Sandy Lake Road, west of the Trinity River, at the
request of Hobart Development, Inc.
DRC DATE: August 30, 2001 and September 6, 2001
CONTACT: Kenneth M. Griffin, P.E., Director of Engineering (972-304-3679)
COMMENT STATUS: PRELIMINARY
1. The proposed inlet to the west of your street connection to Sandy Lake Road is a low point
inlet and cannot be relocated. This may affect the location of your street connection to Sandy
Lake Road as it appears to have inadequate space for the street and the curb return in
additional to the transition to the low point inlet. You should coordinate with the engineer for
Sandy Lake Road project to relocate the inlet west.
2. The area to your east, labeled as the Harrington site, drains onto your site. You should make
adequate accommodations for that drainage. This will be evaluated in greater detail during
plan review process.
3. An off-site easement will be required for the continuation of your storm drain system between
lots 11 and 12.-
4. Some type of on-site drainage system will be required for lots 6, 7, 8, 9 and potentially 10
and 11 to handle the on-site water. While you are showing some systems to accommodate the
drainage, your design will be reviewed in detail during plan review. Some accommodation of
drainage will be needed for lots 3-6, Block A.