Loading...
Cambridge Phase 2-CS 960829DEVELOPMENT REVIEW COMMIITEE ENGINEERING COMMENTS ITEM: The lr ~e__-,_ o~ ¢_~b _rk~,__~ _M~mu~r. Pttase T~o. l~d ~e ~e~p~ of ten ~~ ~g~ f~12 ~~n of ~e~g H~ ~ ~ ~e ~s of M~r, ~d ~pm~e~ 1,~ feet ~ of M~~ ~ ~e m~ea of ~w~, ~~n & ~~es, DRC DA~: Aura 29, 1~ ~ Se~er 5, 1~ CO,ACT: ~e M~, E.I.T., ~~ ~ ~n~eer (~679) COMME~ STA~S: p~'.~,..~n'~'a,~,.~v /FINAL PLAT WITHDRAWN 0 Minimum f'mish floor should be shown for all lots. The entire floodplain note should be provided because it is my understanding that a portion of these lots will still be in the floodplain. Show existing and proposed floodplain line and/or easement. Impact fees will be required. Need to insure that the Final Letter of Map Revision has been provided prior to development. Indicate the number of lots. Will there need to be any sidewalk easement for this development to reroute sidewalks out of the right-of-way to avoid existing trees. Provide right-of-way corner clip at the intersection of Sterling Hill Lane and DeForest to provide room to construct A.D.A. ramp. Provide note on plat for deletion of alleys. DEVELOPMENT REVIEW COMMI2TEE ENGINEERING COMMENTS ITEM: PD-I$1RR, ~.~tates of Camb~_e Manor. r. oning ckange from PD- $F-12 (Planned Development, Single Family-12) to PD-$F-12 (Planned Development, Single Family-12), to amend tke conditions of the Planned Development as they apply to Lot 16, Block D to permit the east side yard building line 10 feet closer to the property line, within The Estate of Cambridge Manor located approximately 1,600feet east of MacArtkur Bl~d., at the request of Anthony and F. ileen Higgins. DRC DATE: August 29, 1996 ami September $, 199g CONTACT: M~d~e Martin, E.I.T., Assistant City Engineer (304-3679) COMMENT STATUS: PP.~I~?.'.IN '.~Y /FINAL ~ No Comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-131RR, Estates of Cambride_e Manor. zoning change from PD- SF-12 (Planned Development, Single Family-12) to PD-SF-12 (Planned Development, Single Family-12), to amend the conditions of the Planned Development as they apply to Lot 16, Block D to permit the east side yard building line 10 feet closer to the property line, within The Estate of Cambridge Manor located approximately I, 600 feet east of MacArthur Blvd., at the request of Anthony and Eileen Higgins. DRC DATE: August 29, 1996 and September 5, 1996 CONTACT: Mike Martin, E.I.T., Assistant City Engineer (304-3679) COMMENT STATUS: .~PRELIMINAR Y ~ ~ No Comments. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: The ~o_~te~ o~ C_~_ 'r!d_~e Mano__r. Phase T~o, ~ Plat. to allow the development of ten additional single family-12 lots and the extension of Sterling Hill Lane within the Estates of Cambridge Manor, located approximately 1, 600 feet east of MacArthur Blvd., at the request of Dowdey, Anderson & Associates, Inc. DRC DATE: August 29, 1996 and September 5, 1996 CONTACT: Mike Martin, E.I.T., Assistant City Engineer (304-3679) COMMENT STATUS: ./'PRELIMINARY ~ ~ e Minimum finish floor should be shown for all lots. The entire floodplain note should be provided because it is my understanding that a portion of these lots will still be in the floodplain. Show existing and proposed floodplain line and/or easement. Impact fees will be required. Need to insure that the Final Letter of Map Revision has been provided prior to development. Indicate the number of lots. Will there need to be any sidewalk easement for this development to reroute sidewalks out of the right-of-way to avoid existing trees. Provide right-of-way corner clip at the intersection of Sterling Hill Lane and DeForest to provide room to construct A.D.A. ramp. Provide note on plat for deletion of alleys.