Cambridge Phase 2-CS 960829DEVELOPMENT REVIEW COMMIITEE
ENGINEERING COMMENTS
ITEM: The lr ~e__-,_ o~ ¢_~b _rk~,__~ _M~mu~r. Pttase T~o. l~d
~e ~e~p~ of ten ~~ ~g~ f~12
~~n of ~e~g H~ ~ ~ ~e ~s of
M~r, ~d ~pm~e~ 1,~ feet ~ of M~~
~ ~e m~ea of ~w~, ~~n & ~~es,
DRC DA~: Aura 29, 1~ ~ Se~er 5, 1~
CO,ACT: ~e M~, E.I.T., ~~ ~ ~n~eer (~679)
COMME~ STA~S: p~'.~,..~n'~'a,~,.~v /FINAL
PLAT WITHDRAWN
0
Minimum f'mish floor should be shown for all lots.
The entire floodplain note should be provided because it is my understanding that
a portion of these lots will still be in the floodplain.
Show existing and proposed floodplain line and/or easement.
Impact fees will be required.
Need to insure that the Final Letter of Map Revision has been provided prior to
development.
Indicate the number of lots.
Will there need to be any sidewalk easement for this development to reroute
sidewalks out of the right-of-way to avoid existing trees.
Provide right-of-way corner clip at the intersection of Sterling Hill Lane and
DeForest to provide room to construct A.D.A. ramp.
Provide note on plat for deletion of alleys.
DEVELOPMENT REVIEW COMMI2TEE
ENGINEERING COMMENTS
ITEM: PD-I$1RR, ~.~tates of Camb~_e Manor. r. oning ckange from PD-
$F-12 (Planned Development, Single Family-12) to PD-$F-12
(Planned Development, Single Family-12), to amend tke conditions
of the Planned Development as they apply to Lot 16, Block D to
permit the east side yard building line 10 feet closer to the property
line, within The Estate of Cambridge Manor located approximately
1,600feet east of MacArtkur Bl~d., at the request of Anthony and
F. ileen Higgins.
DRC DATE: August 29, 1996 ami September $, 199g
CONTACT: M~d~e Martin, E.I.T., Assistant City Engineer (304-3679)
COMMENT STATUS: PP.~I~?.'.IN '.~Y /FINAL ~
No Comments.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-131RR, Estates of Cambride_e Manor. zoning change from PD-
SF-12 (Planned Development, Single Family-12) to PD-SF-12
(Planned Development, Single Family-12), to amend the conditions
of the Planned Development as they apply to Lot 16, Block D to
permit the east side yard building line 10 feet closer to the property
line, within The Estate of Cambridge Manor located approximately
I, 600 feet east of MacArthur Blvd., at the request of Anthony and
Eileen Higgins.
DRC DATE: August 29, 1996 and September 5, 1996
CONTACT: Mike Martin, E.I.T., Assistant City Engineer (304-3679)
COMMENT STATUS: .~PRELIMINAR Y ~ ~
No Comments.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: The ~o_~te~ o~ C_~_ 'r!d_~e Mano__r. Phase T~o, ~ Plat. to allow
the development of ten additional single family-12 lots and the
extension of Sterling Hill Lane within the Estates of Cambridge
Manor, located approximately 1, 600 feet east of MacArthur Blvd.,
at the request of Dowdey, Anderson & Associates, Inc.
DRC DATE: August 29, 1996 and September 5, 1996
CONTACT: Mike Martin, E.I.T., Assistant City Engineer (304-3679)
COMMENT STATUS: ./'PRELIMINARY ~ ~
e
Minimum finish floor should be shown for all lots.
The entire floodplain note should be provided because it is my understanding that
a portion of these lots will still be in the floodplain.
Show existing and proposed floodplain line and/or easement.
Impact fees will be required.
Need to insure that the Final Letter of Map Revision has been provided prior to
development.
Indicate the number of lots.
Will there need to be any sidewalk easement for this development to reroute
sidewalks out of the right-of-way to avoid existing trees.
Provide right-of-way corner clip at the intersection of Sterling Hill Lane and
DeForest to provide room to construct A.D.A. ramp.
Provide note on plat for deletion of alleys.