Ridgecrest-CS121108 T H E • C I T Y • O F
COPPELL
o, o
x c S'�; a q
November 8, 2012
Colin Helffrich
Dowdey, Anderson& Associates
5225 Village Creek Pkwy, Ste 20
Plano TX 75093
RE: Ridgecrest Estates
Dear Mr. Helffrich:
A pre-construction conference on the referenced project has been scheduled for Monday,
November 12 , 2012 at 9:00 a.m. in the First Floor conference room in Town Center
at 255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincere/ ,
La 1 Davis, C• struction Inspector
Office Phone: 9 2-304-3684
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Michael Garza, P.E., Civil Engineer
Michael Arellano, Chief Building Official
Mike Hodge, Residential Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative