Loading...
Ridgecrest-CS121108 T H E • C I T Y • O F COPPELL o, o x c S'�; a q November 8, 2012 Colin Helffrich Dowdey, Anderson& Associates 5225 Village Creek Pkwy, Ste 20 Plano TX 75093 RE: Ridgecrest Estates Dear Mr. Helffrich: A pre-construction conference on the referenced project has been scheduled for Monday, November 12 , 2012 at 9:00 a.m. in the First Floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincere/ , La 1 Davis, C• struction Inspector Office Phone: 9 2-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Michael Garza, P.E., Civil Engineer Michael Arellano, Chief Building Official Mike Hodge, Residential Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative