Loading...
GTE (Clear C2)-PT121113 cc J, co,ivov,A-3 oil ri 2- A copy of the approved permit must be on the job site at all times. CC: Applicant .i 'r ° Page 1 of 4 Public Works Ai Permit File Rev. 06/2012 Orig. to Project File .,M q r"' kr, -.)'-- 2 A. _ r C VD Y, -∎I RIGHT-OF-WAY USE PERMIT APPLICATION fir\ � .�� + � - Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer @coppelltx.gov(see button below) Date of Submittal: 11/7/12 Applicant's Job # / Work Order # 9PF12TM 103 PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C No C ❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address 724 Canyon Dr Coppell General Contractor Henkels '& McCoy Contact# 972-512-2900 E-mail address to return permit martinez.mike@verizon.'corn 1 ,, Representative: Paul Messenheimer Franchise, 'Telephone#: 972-318-5186 company: '11,41,- ' E-mail address:Paul'm'messenheimer®one•verizon.corn (for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C Atmos Energy (- Verizon C SBC/ AT&T r Time Warner Cable C CoSery Electric/Gas C Other General Description of Work(InaccordancewithOrd Na.2001 944)•PLEASE ATTACH PLAN O PROPOSED WORK 4' '� to Q1.\' . Bore N C e)l Rd from existing Fiber Dist Hub and Directional bore south and then west on Canyon Otto place a 201 i ,z,' terminal l for 724 Canyon Dr t,.4," 4 a t �� Rw .. Estimated Start Date 11/26/12 Estimated Completion Date* 12/31/12 * Completion requires submittal of Completion Verification Notice (see page 4) Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason:will make contact 48 hrs prior to const. C Yes ( No >Is removal of existing streets, alleys, or sidewalks necessary? C Yes ("i No if YES,project must have City inspection prior to concrete replacement Right-of-Way Use Permit Application Pace 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 >Attach barricade plan/ trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >Attach Work Order(franchise only)and/or 1 set of prints showing proposed work. Locates four existing ranchise utilities must be don 48 hours prior to beginning work. or,Cit tility locates, ail 1972-462 5156 to schedule X48„hours prior to beginning work.: The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept.for approval prior to beginning work. Submittals by e-mail should go to engineer @coppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail,provide a valid e-mail address on Page 1.) Mike Martinez 11/7/12 Signature of Utility Company Representative Date Cliff Stephens 11/7/12 Signature of Contractor Representative Date II)li'- Signatur o ity Representative Date Comments t� �p� ,-J `- _/ r-` t7 114 7-Ti t YR•t6 W �O' c4- (IV Poktr m- ^'C� L 0t 151 . >NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. GENERAL NOTES °3E18115 (06) a 1 I M°87057058 DIR BORE DETAIL 1550' 2423.40 1.CONSTRUCTION FOR THIS PROJECT WILL BE DONE OBSERVING ALL THE REOUIRED RULES AND PIREL LT NONARMOR 48-SM REGULATIONS.PROPER SIGNS WILL BE PLACED ALONG R.O.W.AS REOUIRED BY STATE,CITY,AND COUNTY. F0172,205-216 2.ALL CONSTRUCTION WILL CONFORM TO VERIZON PRACTICES.. m I I XDD,13-48 3.WHERE PERMITS FROM STATE,COUNTY,TOWNSHIP,CITY,RAILROAD OR GOVERNMENTAL AGENCIES ARE "3645818 (PP) -0 REOUIRED,ALL WORK PERFORMED WILL COMPLY WITH THOSE AGENCIES STANDARD SPEC'S AND SAFETY I I <3PFAOUR> M*919817 RULES. 1.5 'CONDUIT ; 1400' 2423.40 PIREL UT RIB NONARM 48-SM 4.FACILITIES ARE PLOTTED USING AVAILABLE PLANS AND FIELD OBSERVATIONS.THE ACTUAL I I H4012,361-385 <PP> LOCATION AND DEPTH OF UTILITIES TO BE VERIFIED BY THE PLACING CONTRACTOR.THE PLACING XDD,26-48 <PP> CONTRACTOR IS TO NOTIFY STATE,COUNTY,CITY AND ALL OTHER UTILITY COMPANIES 48 HOURS PRIOR TO CONSTRUCTION START. I I 5.ALL RIGHT OF WAYS SHALL BE RESTORED TO THE ORIGINAL OR BETTER CONDITION. 6,PROTECTION FROM DAMAGE IN THE PERIOD BETWEEN MAKING EXCAVATION AND FINAL PLACEMENT IS I INCLUDED AS A PART OF THE BACKFILL FOR TRENCHES OF EXCAVATED CABLES. ) C MANSIONS BY THE LAKE 7.NO FOREIGN DEBRIS MAY BE A PART OF BACKFILL FOR TRENCHES OR EXCAVATED CABLES. I I 8.LOCATION OF UTILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR WHETHER OR NOT SUCH LOCATIONS ARE SHOWN ON THE PRINTS. I I 9•ANY DAMAGE TO UTILITIES IN THE COURSE OF THE WORK SHALL BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE. 10.RIGHT OF WAY SHALL BE SMOOTHED WITH ALL VOIDS FILLED BEHIND PLOWING OR EXCAVATION I (-----OPERATIONS DAILY,UNDERGROUND OBJECTS ENCOUNTERED AND BROUGHT TO THE SURFACE DURING PLOWING OR EXCAVATING SHALL BE PROMPTLY REMOVED FROM THE RIGHT OF WAY. I I I1.ALL CHANGES OR DEVIATIONS MUST BE FIRST APPROVED BY VERIZON ENGINEERING. 'E 65' R.O.W. ►' I2.PLACE ROUTE AND MARKER SIGNS AS DIRECTED BY VERIZON PRACTICES. I -.' 38' B-B — 13.ALL CABLES AND OR MULE TAPE IS TO BE GROUNDED AT THE ENDS.AND BONDED THROUGHOUT THE 11'—a• .41- 16' ROUTE. I4.KEEP ALL VEHICLES,EOUIPMENT,AND PERSONNEL OFF OF RAILROAD R.O.W.AT ALL TIMES. I CC I J I w I ROAD BORE PROFILE: NOT TO SCALE a` D- 65' R.O.W. i o � rE 38' B-B >I ••�• N COPPELL RD I ••• I i °3618124 2423.40 (06) M°11014039 "3618119 2423.40 (06) I I HANDHOLE ° M"11029932 N. • ° ,\ TYP FDH CH 1 HSG TYP CABINET Q IN H4012A.1-32 IN H4012B,1-32 N _1 IN H4012C,1-32 w IN H40120,1-32 12' WL I I CJ a IN H4012E,1-32 C VERIZON 1.5' DUCT 48•RDAD BORE IN H4012G,1 32 PLACE 1.5•HDPE CONDUIT I cli' I Z IN H4012H.1-32 s € ,i , ao IN H40121.1-32 c0 IN H4012J,1-32 `V •3646173 I IN XDD.35 -38 �/ '3645818 -0 IN XDD,353-383 2000' Term Tail *3618115 o- IN F0172,216-216 3645670 OUT H4012,1-432 2000' Term Tail 7.5' BOC- *: AA ' ' I AA NOTE AREA SEE PRINT 2 41 VERIZON 9TS AREA STATE: TX DIVISION: NORTHEAST I EXCH.: 5647 REM. CD.: 005 �1►�; KILOVOLTS W.C.: 4620 IWO NO.: 9PF12TM CONTROL NUMBER: 103 � NI iiigi 0.00 TITLE: 724 CANYON DR TAX DST.: • ' 1 PRIMARY VOLTAGE THINK SAFETY TWP: • I RNG.: • ISEC,: • SAL: XXX TEx S8 WORK tJTdISE�tBUR,J T,) ��\ K SAFELY DATE: 10/31/12 IREV. DATE: SCALE: 1'=50.00' � @4� EXPOSED FILE: WP1 DRWN ENG APRVD PRINT LEWISV LLE-SOUTH MM MM 1 OF 3 AA S E PRINT 1 AA I . POTHOLE ALL WATER LINE CROSSINGS 11'i i 16' VERIFY LOCATION AND DEPTH. , 5' � 65'R.O.W.R,O. � MAINTAIN 2 FEET OF CLEARANCE. PLACE I.5•NDPE CONDUIT I I � , DIR BORE DETAIL •3646173 U I :4: iii ll 2000' Term Tell I ; 1.5 •CONDUIT 7.5' BOC-1 I ; 0 A u l 2PRCp T z ; IZ POTHOLE WL (POTHOLE WLI U o POTHOLE WL N i I I2•SS a m m I m I CC b Co ret Ea IIIIMMB all 1- S ? J CANYON DR N 0" CO 3o s EL' 72•RCP I —CL— CO C - Ll. 3 J Q m m I I I I I I I I I I I I NOTE AREA 41 VERIZON 9Ts AREA STATE: TX DIVISION: NORTHEAST I EXCH.:5647 REM. CD.: 005 1Se KILOVOL TS W.C.: 4620 IWO NO.: 9PF12TM CONTROL NUMBER: 103 :K.La.: 8.88 TITLE: 724 CANYON DR TAX DST.: • �/�- � THINK SAFETY PRIMARY VOLTAGE TWP: • I RNG.: • ISEC.: • SAL: XXX (� 41 T.USE/(BUR.J T.) MORK SAFELY el DATE: 10/31/12 (REV. DATE: SCALE: 1'=50.00' oleo EXPOSED FILE: WP2 DRWN ENG APRVD PRINT LEWISVILLE_SOUTH MM MM 2 OF 3 I FUTURE BUILDING 724 CANYON DR J a_ "3579014 -0 ia1 -0 °3579014 (00) -0 °3579016 (00) M°395278 M°395278 500' 2422.20 1850' 2423.20 YGN 24-00 YGN 24-00 4-FIBER XDD,1-20 XDD,1-20 63646173 2423.40 (12) T269,47-48 T269,47-48 724 CANYON DR XDD.23-24 XD0,23-24 TI 3646390-391 PLACE 17'X30' XDD.3-4 I PLACE I.5' CONDUIT U (POTHOLE WL) "3579016 -0 HANDHOLE © /� m m In FN (V o Z —C I — r 72'RCP 0_ c w . w __ __ _ __ -8' SS---IN 0 m TYPICAL DRIVEWAY BORE PROFILE:NOT TO SCALE POTHOLE ALL WATER LINE CROSSINGS VERIFY LOCATION AND DEPTH. DRIVEWAY MAINTAIN 2 FEET OF CLEARANCE. 7 io M DIR BORE DETAIL VERIZON 1.5'DUCT 1 14. K- ----- 1.5 'CONDUIT NOTE AREA liff VERIZON 9TS AREA STATE: TX DIVISION: NORTHEAST I EXCH.:5647 REM. CD.: 005 iii KILOVOLTS rll: „� W.C.: 4620 IWO NO.: 9PF12TM CONTROL NUMBER: 103 'veii�i►�' e.ee TITLE: 724 CANYON DR TAX DST.: • t THINK SAFETY WT It .J TWP: RNG.: SEC.: • SAL: XXX � WORK SAFELY .Z DATE: 10/31/12 IREV. DATE: SCALE: 1':50.00' 1 EXPOSED ye DRWN ENG APRVD PRINT LEWISVfILL_SOUTH FILE: WP3 MM MM 3 OF 3 1