Blackberry Farm-CS121101
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-259-SF-7/9, Blackberry Farm,
a zoning change request from SF-12 (Single
Family-12) to PD-259-SF-7/9 (Planned Development-259-Single Family-7 & 9),
to permit the development of 82 single-family lots and five (5) common area lots
on 54.8 acres of land located on the north side of Sandy Lake Road,
approximately 750 feet northeast of Starleaf Street (extended), at the request of
David Hayes, Holmes Builders.
STAFF REP.: Gary Sieb PROJECT ID# PD-12-0055
DRC DATE:
October 25, 2012 and November 1, 2012
CONTACT:
Michael Garza, P.E., Civil Engineer, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. We have concerns with bank stabilization along the creek. The permanent erosion
protection/bank stabilization will be reviewed in detail.
3. We will need the CLOMR submitted for review and it will also have to go through the
CDC process.
4. The current effective floodplain needs to be shown.
5. There will need to be access provided to get into the creek for maintenance by HOA.
6. The bridge structure will need to be signed by a professional engineer.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Blackberry Farm, Preliminary Plat,
a preliminary plat to subdivide 54.8 acres of
property to permit the development of 82 single-family lots and five (5) common
area lots, located on the north side of Sandy Lake Road, approximately 750 feet
northeast of Starleaf Street (extended), at the request of David Hayes, Holmes
Builders.
STAFF REP.: Gary Sieb PROJECT ID# PP-12-0056
DRC DATE:
October 25, 2012 and November 1, 2012
CONTACT:
Michael Garza, P.E., Civil Engineer, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.