Loading...
Cambridge Phase 2-CS 951109CONSUI'TING ENGINEERS November 9, 1995 Mr. Alan Johnson Federal Emergency Management Agency Federal Insurance Administration Risk Studies Division 500 C Street, $.W. Washington, D.C. 20472 Re: Request for CLOMR The E~ate~ of Camtxffige Manor, Phase II Coppell, Texas Dear Mr. Johnson: Enclosed is an application package for request of a CLOMR. The project is within the flood fringe of Denton Creek in Coppell, Texas, and involves fill obly. A check for 1;280.00 Is enclosed. For your Information I ttave also enclosed the LOMR from the Phase 1 portion of this project, which is now complete. We used the proposed condition~, model from Phase 1 as the basis for our study. ~ This submittal wes delayed while waiting for a Jurisdictional Deter~nination from the Corps of Engineem (attached). Because of this, we are hoping to'. expedite this review any way we mn. Your help would be greatly appreciated. If you or your staff have any questions or need additional informm tion, please call. Cordially yours, 8plato & DeOtte, Inc. 4230 LBJ Freeway, Suite 215 · Dallas, Texas 75244 · (214) 699-7477 J, Fax (214) 385.1444 1020 Macon Street, Suite 16 · For~ Worth, Texas 76102 · (817) 788-8590