Loading...
ST0501-CS121115 T H E • C 1 T Y O F COPPELL s * o x A s I MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: George M• _ all,P.E., Traffic Engineer (4 From: Lar !'i it s, f obstruction Inspector Of 'fie r' 1 : (972)304-3684 Fax: '72)304-3570 Date: November 15,2012 RE: WALK-THRU INSPECTION for Deforest Road, Project#ST 05-01 A walk-thru inspection for paving, utilities, drainage, traffic and all other contracted improvements on the referenced project has been scheduled for: Thursday, December 6, 2012 at 9:00 a.m. (weather permitting) Please gather to begin the inspection process at the MacArthur end of Deforest, and let me know if I can be of further assistance prior to the stated date. cc: Per Birdsall, Streets Operations Manager Traffic Control Department Utility Operations Department Tim Oates, Deputy Chief/Prevention David Malone,Asst. Fire Marshal Walter Mitchell, Tiseo Paving Company Robert Caudill, Tiseo Paving Company "CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN"