ST0501-CS121115 T H E • C 1 T Y O F
COPPELL
s
*
o
x A s I
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: George M• _ all,P.E., Traffic Engineer
(4
From: Lar !'i it s, f obstruction Inspector
Of 'fie r' 1 : (972)304-3684
Fax: '72)304-3570
Date: November 15,2012
RE: WALK-THRU INSPECTION for
Deforest Road, Project#ST 05-01
A walk-thru inspection for paving, utilities, drainage, traffic and all other contracted
improvements on the referenced project has been scheduled for:
Thursday, December 6, 2012 at 9:00 a.m. (weather permitting)
Please gather to begin the inspection process at the MacArthur end of Deforest, and let
me know if I can be of further assistance prior to the stated date.
cc: Per Birdsall, Streets Operations Manager
Traffic Control Department
Utility Operations Department
Tim Oates, Deputy Chief/Prevention
David Malone,Asst. Fire Marshal
Walter Mitchell, Tiseo Paving Company
Robert Caudill, Tiseo Paving Company
"CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN"