Big Cedar-CS 911021The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
October 21, 1991
Mr. D. Matthew Goodwin, P.E.
6001 Bridge Street, Ste. 100
Fort Worth, TX 76112
Re:
Big Cedar Addition
Development Fee Assessment
Dear Mr. Goodwin:
We are enclosing a copy of the City of Coppell Development Fee Assessment
List along with copies of the development fee calculations for the Big Cedar
Addition to the City of Coppell.
Please provide a check made payable to the City of Coppell in the amount of
$47,829.36 plus 2% of the construction cost, and forward it to Mr. Alan
Johnson, Assistant Finance Director, along with a copy of the Fee Assessment
List. In addition, please provide our office with a copy of your Engfneer's
estimate for this project or contract amount for verification of the
construction inspection fee.
Please provide a copy of your paid receipt to our office and to Shimek,
Jacobs & Finklea, Attn: Mr. Gary C. Hendricks. Copies of your receipts will
help us verify payment of the required fees and assure a timely beginning of
this project.
We look forward to working with you on this project. If you have any
questions, please do not hesitate to contact me.
/
Sincerel~
M. Sho~sjand~ P.E.
Acting City Engineer
Enclosures
cc:
Mr. Gary L. Sieb, Director of Planning and Community Services
Mr. Frank Trando, Finance Director
Mr. Alan Johnson, Assistant Finance Director
Mr. Steve Goram, Director of Public Works
Mr. Gary C. Hendricks, P.E., Plan Review Engineer
CITY OF COPPELL
DEVELOPMENT FEES
Date: October 21, 1991
Project: Big Cedar Addition
Park Fee
(50% payable prior to Council Approval)
(50% payable with Building Permit)
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100% due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due at Issuance of Building Permit)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Street Sign Fee
(100% due prior to Council Approval)
Street Light Fee
(100% due prior to Council Approval)
Construction Inspection Fee
(100% due prior to Council Approval)
(2% of project construction cost to
be provided by the Developer's
Engineer)
TOTALS
Total
Asses~e~R~
$ 6,150.00
$27,060.00
$ 4,100.00
$17,302.00
4,100.00
392.36
$59,104.36
Amount Due
Prior to
Council
Approval
$ 3,075.00
$27,060.00
$ -0-
$17,302.00
$ -0-
392.36
$47,829.36
TOTAL AMOUNT DUE PRIOR
TO COUNCIL APPROVAL:
$47,829.36
Plus 2%
Construction
Inspection Fee
· This fee cannot be assessed until after TU Electric submits the lighting
plan for the proposed project. Once the plan is submitted, $292.60 per
light will be assessed.
Note: This project is NOT within the Coppell Municipal Utility District No.
1. Therefore, the Wastewater Impact Fee is due prior to Council
Approval.
BIG1
COPP~LL POB/~C [~RKS
Septe_m~er 27, 1991
Shohre Daneshmand, A~ing City Engineer
Public Works Staff ~~
Development Fees for Big Cedar Addition
The following fees should be assessed on the above referenced
project.
Water I~act Fee=
41 - 5/8' x 3/4'
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
41., ESU's
ESU's
Total 41 ESU"s ~ $660.00 ea = ~
100% due prior to Council approval of finaI plat.
WastewaterI~pact
41 - 5/8' x 3/4' Domestic Meter/s = 41. ESU's ~ $422.00 = $27 302.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
utility District #l this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection ~ee
41 Connections ~ $100.00 each = $4,100.0,0
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee H/A
41 Connections ~ $100.00 each = ~
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after.TUElectric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
41
Residential Lots at $150.00 each =
Units (Multi family) at $75.00 each
50% of the amount specified above shall be paid by the Developer~
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
STI~ET SIGN ~SESSI~ENT~
for Biq Cedar Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE
~ENDED PRICE
No Parking $ 53.1~
Speed Limit $ 63.54, 2
Yield $ 58.56
Stop $ 6§.12
Street Name $ 11.60 2
Stop & Street Combo $ 96.85 2
OTHER
Curve siqns $ 48.36 1
$
TOTAL
$ 7o
* Cost breakdowns may be obtained from Public Works by written
request.
BIGCEDAR ....