Villas at LV 2-CS121119 T H E C 1 T Y O F
COPPELL
, 49,"
9
A E I
November 19, 2012
Barbara Morgan, VP
KART Construction, Inc.
124 S. Norwood Dr.
Hurst TX 76053
RE: Villas at Lake Vista, Phase 2
Overtime Inspection
Dear Ms. Morgan:
In accordance with your request, the City of Coppell Engineering Department provided inspection
service at the referenced location on Saturday, November 17, 2012. The overtime rate including
salary and benefits is $54.00 per hour. Four hours (4 hrs.) were charged to your company on that
date.
Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell
to the following address:
City of Coppell Finance Dept.
255 Parkway Blvd
P.O. Box 9478
Coppell, TX 75019
If you should have any questions,please call (972) 304-3679.
Sincerely,
'� / Imo•
Larry Davi
Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
cc: Finance Dept.
Project Fee File
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
NOV-16-2012 13:10 FROM:KART, INC. 948-872-2186 TO:19723043570 P.2/2
ICART
CONSTRUCTION & EQUIPMENT CO., INC.
November 16, 2012
Larry Davis
Construction Inspector
The City of Coppell
255 Parkway Boulevard
P.O. Box 9478
Coppell,TX 75019
Re: Villas at Lake Vista
Please accept this as our official request to work our utility crew eight(8)hours on Saturday,
November 17, 2012 at the above project.
Kart Construction agrees to pay the standard inspector overtime charges of$54.00 per hour.
Sincerely,
Sae-a-U.-412
Barbara Morgan,Vice President
Kart Construction and Equipment Co.,Inc.
bmorgan @kartcoinc.com
BRM/br
124 S. NORWOOD DRIVE P.O. Box 1522 HURST, TX 76053
OFFICE 817.282.8000 FAX 817.282.8005