Loading...
Villas at LV 2-CS121119 T H E C 1 T Y O F COPPELL , 49," 9 A E I November 19, 2012 Barbara Morgan, VP KART Construction, Inc. 124 S. Norwood Dr. Hurst TX 76053 RE: Villas at Lake Vista, Phase 2 Overtime Inspection Dear Ms. Morgan: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, November 17, 2012. The overtime rate including salary and benefits is $54.00 per hour. Four hours (4 hrs.) were charged to your company on that date. Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call (972) 304-3679. Sincerely, '� / Imo• Larry Davi Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 NOV-16-2012 13:10 FROM:KART, INC. 948-872-2186 TO:19723043570 P.2/2 ICART CONSTRUCTION & EQUIPMENT CO., INC. November 16, 2012 Larry Davis Construction Inspector The City of Coppell 255 Parkway Boulevard P.O. Box 9478 Coppell,TX 75019 Re: Villas at Lake Vista Please accept this as our official request to work our utility crew eight(8)hours on Saturday, November 17, 2012 at the above project. Kart Construction agrees to pay the standard inspector overtime charges of$54.00 per hour. Sincerely, Sae-a-U.-412 Barbara Morgan,Vice President Kart Construction and Equipment Co.,Inc. bmorgan @kartcoinc.com BRM/br 124 S. NORWOOD DRIVE P.O. Box 1522 HURST, TX 76053 OFFICE 817.282.8000 FAX 817.282.8005