MA1009-CS121119 LJ_ D e LJLJ
n
DATE 11/19/12 JOB NO.CPL11248
teague nail & perkins RE: Andy Brown &Alex Canal - Erosion Imprv's
TO: Mr. Keith Marvin, P.E. Submittal - Preliminary Plans (60%)
Engineering Department
255 Parkway Blvd. MA I (0 -- C>c)
Coppell, TX 75019
972.304.3681
WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change Order ❑
COPIES DATE NO. DESCRIPTION
5 Nov '12 1 Full Size Preliminary Plans, 60% (22x34 bound)
5 Nov '12 2 Half Size Preliminary Plans, 60% (11x17 bound)
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
Keith, Attached are full and half size preliminary plans for your review. Please note, I corrected the scale bar
on sheet 3 from what I sent via email on Friday.
COPY TO:
John Elias (same no. of copies)
TNP File SIGNED: Kyle Dykes, P.E., CFM
If enclosures are not as stated,please notify us immediately.
Fort Worth-1 100 Macon Street n Fort Worth,Texas 76102n 817.336.5773 Dallas 17304 Preston Road,Suite 1340 n Dallas,Texas 75252n 214.461.9867
Denton■1517 Centre Place Drive,Suite 320n Denton,Texas 76205 n 940.383.4177 Sherman 200 North Travis Street,Suite 500 n Sherman,Texas 75090 903.870.1089
Registered by the Texas Board of Professional Engineers,Firm No.F-230 n Registered by the Texas Board of Professional Surveyors,Firm No.100116-00