Big Cedar-CS 910909FILE COP11' P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Matthew Miller, P.E. Risk Studies Division Federal Insurance Administration Federal Emergency Management Agency 500 C Street, SW Washington, D.C. 20472 Re: city of Coppell Conditional Flood Insurance Study Revision for Tributary G-1 to Grapevine Creek as a Result of a Proposed Floodway Fringe Development Dear Mr. Miller: This letter will present information for your review relative to a proposed fill project in the Tributary G-1 flood plain. This project involves the establishment of a detailed flood plain and floodway and proposes fill outside of the established existing floodway. This report has been reviewed by Morrison Hydrology/Engineering, Inc., for the City and is recommended for approval, assuming that the requirements are met for a Corps of Engineers 404 Permit which is presently being reviewed by the Corps. (See attached letter dated 9/4/91). We request that FEMAconsiderthis conditional request and provide a response as soon as possible. If you have any technical questions concerning this submittal, please direct them to Goodwin & Marshall, Inc., at (817) 429--4373. For administrative questions, please call me at (214) 393-1016. Thank you for your attention to this matter. Sincerely, cc: D. Matthew Goodwin, P.E. Ron Morrison, P.E. msd/gch/bhj ~OBRISON HYDROLOGY 520 AVBN~E H BAST, SUITE 102 ARLI~ON, TEXAS 76011 September 4, 1991 Ms. Shohre Daneshmand Acting City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Review of: Floodplain Analysis for a portion of Tributary G-1 of Grapevine Creek City of Coppell, Dallas County, Texas by Goodwin and Marshall, Inc. of Fort Worth, Texas Dear Ms. Daneshmand: This is a follow-up letter to our previous review letters of July 27 and August 5 1991, same subject. We have received a copy of the FEMA submittal for this project. This report addressed most of our concerns with the previous submittals. It is our understanding that Goodwin and Marshall, Inc. have contacted the Fort Worth District Corps of Eugineers and requested a Section 404 Permit as required by Section 4.C.g of the Coppell City Floodplain Management Ordinance. When a plat is provided it should be reviewed regardin~ information to be contained on the plat related to the flood plain. These are fully explained in the Ordinance. One of the most important items is to show the lowest finished floor of all construction elevated to a minimum of two (2) feet above the FIS base flood elevation or to one (1) foot above the design base flood elevation whichever is higher. Conditional upon a favorable response from the Corps of Engineers 404 Permit we recommend approval of this report and suggest that you send it to FEMA for a Conditional Letter of Map Revision as per the City Floodplain Management Ordinance. Coppell Review September 4, 1991 Page -2- We have attached a sample letter that might be used as a guide in submitting the report to FEMA. We will be glad to provide additional information if needed. Sincerely, Senior Hydrologist Attachment FLOODP~ ANALYSIS for a Portkm of TRIBUTARY G-I at GRAPEVINE CR~Z~uc City of Coppelk DMlm Comity, Tm Fred Joyce - Mary Myers Entmpds~, Inc. and August, 1991 0ODW] l 6001 Blidge Strcct, Suitc 100 Fort Worth, Tggm '76112 '?.-~' ~. r :' :". %¥:" FLOODPLAIN ANALYSIS for TRIBUTARY G-1 of GRAPEVINE CREEK City of Coppell, Dallas County, Texas TABLE OF CONTENTS Parc Number INTRODUCTION .......................................................... 1 Project Location ........................................................ 1 ENGINEERING METHODOLOGY ............................................ 2 General ............................................................... 2 H~h'olo~c Anal~is ...................................................... 2 Methodology ...................................................... 3 Existing Conditions Model ............................................ 4 Hydraulic Analysis ....................................................... ~ Existing Conditions ................................................. ~ Proposed Improved Conditions ........................................ 6 Floodway ......................................................... 8 DISCUSSION .............................................................. 8 SUMMARY ............................................................... 9 CONCLUSION ............................................................ 10 TABI.FS TABI.F. ONE - Peak Discharges at the Confluence of Tn'buta.ry G-1 and Grapevine Creek .......................................... 4 TABLE TWO - Existing & Proposed Improved Conditions 100-Year Water Surface Elevations and Velocity Calculations ................................... 7 TAB!~ OF CO~ (Continued) FIGURES Figure 1 ...................................................... Location Map Figures 2 through 11 .................................... Tn'butary G-1 Crms-Sectiom Figure 12 ...................... 100-Year Water Surface Profiles for Existing Watershed Plate 1 Plate 2 Plate 3 PLATES .................................. Watershed Area Map for Tn'butary G-1 ........................ Exis~g Conditions 100-Year Floodplain Delineations ............... Proposed Improved Conditions 100-Year Floodplain Delineations APPENDIX A ............................. Hydrologic Analysis for Existing Conditions Watershed; 10-, 50-, 10(L, & 500-Year Frequency Events APPENDIX B ......................... Existing Conditions Hydraulic Model & Results APPENDIX C ................. Proposed Improved Conditions Hydraulic Model & Results APPENDIX D ................................ Floodway Hydraulic Model and Results APPENDIX E ...................... Floodway Model with Proposed Improved Conditions