Loading...
WA9401-CS 950310ARCHITECTURAL UTIUTIES, INC. GENERAL CONTRACTORS 300 WEST RAMSEY P.O. BOX 11586 FORT WORTH, TX 76110 817-926-4377 429-8191 METRO 817-926-4387 FAX March 10, 1995 Nx. Ken Griffin City of Coppell P. O. Box 478 Coppell, TX 75019 Re: East Beltline Road Project WA 94-01 Dear Mr. Griffins There is some disagreement regarding the final payquantity for Pay Item #5, "Bore and Install Pipe beneath Boltline Road". The quantity shown in the proposal is 235.6 LF. The actual measured quantity in the field is 262 LF, an overrun of 26.4 LF, or 11.2%. This translates to a cost overrun of $3,212.09, on this pay item. There are two reasons for the overrun. Initially, 11 feet was added to move thebeginning and endingbore points a minimum of ten feet from back of curb. Secondly, the estimated length established in the proposal is short by approximately 15 LF, as measured between the original bore limits. I have enclosed revised Estimate No. 3, which invoices the City for 262 LF instead of 251 LF. I feel that this pay quantity if fair and I fail to understand the reluctance of the City to pay it since this is a unit price contract. If the City decides not to pay the invoiced amount, please give us written notice so that we can properly appeal. Please call me if you have any questions. Sincerely, Houston L. Cavin Project Manager HLC/Jlr:lc\94061