Loading...
ST0501-LR121102 NOV-21-2012 05:36 P.20 Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352.6957 • Fax (214) 352-6972 • www .texascmt.com GENERAL REPORT • CANCELLATION ❑ STAND-BY Report Date: November 2,2012 Test Date: October 31,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 15 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Cancellation on Arrival City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Time: 12:00 PM Type of Service Scheduled: Concrete Testing for Sidewalk Time Left Lab. 11:30 AM Time Arrived at Job: 12:10 PM Time Left Job: 12:15 PM Time Returned to Lab: 1:00 PM Total Charged Time: 1.5 Hours Reason: Dwayne with California Construction said Walter Forgot to Call to Inform Us of the Concrete Delay to 2:00 PM. • Technician: RG cc: Mr. Larry Davis -City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 Mr. George Marshall -City of Coppell,Phone: 972-304-3562; via E-mail: gMarshall @coppelltx.gov Mr.Dan DeGroot-Burgess&Niple, Inc., Phone: 972-620-1255;via E-mail: Dan.DeGroot @BurgessNiple.com Mr. Robert Caudill- Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rCaudill@TiseoPaving.com Mr. Bobby Bounds- California Construction, Phone: 972-670-0368; via E-mail: Bobby@CalConTex.com Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.20